SOLICITATION NOTICE
Z -- RECOVERY Potter Creek Bridge No. 534-15.7 Replacement, Kootenai county, Idaho
- Notice Date
- 6/26/2009
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
- ZIP Code
- 80401
- Solicitation Number
- AG-82B1-S-09-0019
- Archive Date
- 8/28/2009
- Point of Contact
- Janet Stinson, Phone: 3032755095, William M. Pfeifer, Phone: 3039083120
- E-Mail Address
-
janetstinson@fs.fed.us, wpfeifer@fs.fed.us
(janetstinson@fs.fed.us, wpfeifer@fs.fed.us)
- Small Business Set-Aside
- Total HUB-Zone
- Description
- RECOVERY - This project will be wholly funded under the American Recovery and Reconstruction Act of 2009 (http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=111_cong_bills&docid=f:h1enr.pdf). Interested offerors are encouraged to review the required clauses and reporting requirements for projects funded under the Act. These documents can be found in the Federal Acquisition Regulation (http://farsite.hill.af.mil or http://www.acquisition.gov/far), current Federal Acquisition circulars (http://www.arnet.gov/far/fac.html) and at the Recovery.gov website. It is anticipated that the award will be 100% set-aside for competitive HubZone firms as there are two or more qualified offerors under the NAICS code that could offer bids. It is anticipated that the NAICS code will be: 237310, construction with a size standard of: $33.5M The Product Service Code is: Z222 Anticipated Contract Type: Competitive and Firm Fixed Price FBO Product Code: Z The Forest Service intends to issue a solicitation for this project using FAR Part 14 procedures for sealed bidding. The solicitation package for this project should be available approximately July 14, 2009 and will be posted on the FEDBIZOPPS website, which will contain all information necessary to formulate and submit a responsive bid. A pre-bid meeting is expected, but a firm date has not yet been established. The project cost estimate is between $100,000 and $250,000. Performance and Payment Bonds will be required per the Miller Act and Davis-Bacon wage rates will apply. All responsible sources may submit a response which must be timely received to be considered for award by the U.S. Forest Service. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http:www.ccr.gov//. Potter Creek Bridge is located at Road 534 in Coeur D'Alene River Ranger District in Secton 33, Township 52 North, Range 1 East, in Kootenai County, Idaho. The work consists of, but not limited to minor clearing and grubbing, erosion control measures, roadway structural excavation, removing and disposing of an existing timber bridge, compaction, riprap, roadway resurfacing, supply and setting pre-cast structural concrete grade beams, pre-stressed concrete structure members (tri-deck beams), pre-cast concrete wingwalls and other incidental items necessary to complete the project in acccordance with the plans and specifications.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/8a09c8509d09e956e7423171a23323ee)
- Place of Performance
- Address: Location is contained in the description., Idaho, United States
- Record
- SN01858077-W 20090628/090627000024-8a09c8509d09e956e7423171a23323ee (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |