Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 28, 2009 FBO #2771
AWARD

59 -- RECOVERY--59--RECOVERY -- Electrical Upgrade of the Tetilla Peak Water Pump & Purification System

Notice Date
6/26/2009
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Albuquerque, US Army Engineer District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP09T0053
 
Response Due
6/15/2009
 
Archive Date
8/14/2009
 
Point of Contact
Stephanie Whatley, (575) 479-6095<br />
 
E-Mail Address
US Army Engineer District, Albuquerque
(stephanie.n.whatley@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-09-P-0092
 
Award Date
6/26/2009
 
Awardee
Industrial Electric-Automation, Inc.<BR>501 Kinley Ave NE<BR>Albuquerque, NM 87102
 
Award Amount
19,400.00 Recovery
 
Line Number
0001
 
Description
RECOVERY. Work for this contract consists of removal of the existing 480V primary 120/240V secondary 1Ph 15KVA transformer and installation of a new 480V primary 120/240V 1Ph 30KVA transformer in the same location; Removal of existing 12-pole 120/240V 1Ph power panel (30-amp-main) and installation of a new 18-pole 120/240V 1Ph with 100 amp main breaker in the same location (NEMA-1 enclosure keyed lock); At the site of the power panel, extension of new secondary power services from new 120/240V 30KVA 1Ph transformer to new power panel; Replacement of roto phase starter with new NEMA Size 4 and enclosure; Replacement of lighting contactor with new lighting contactor and enclosure; Replacement of timer box with six (6) new timers, bases and enclosures; Replacement of well pump #1 with new 600V 30 amp fuseable disconnect and new NEMA size 1 starter and enclosure; Replacement of well pump #2 with new 600V 30 amp fuseable disconnect and new NEMA size 1 starter and enclosure; Replacement of duplex pump control with new duplex pump control and enclosure; and Replacement of 12inx12in gutter with new 12inx12in gutter (Wire Raceway). Contract duration is thirty (30) days. NAICS Code 238210 with a size standard of $14M.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/W912PP09T0053/listing.html)
 
Record
SN01858067-W 20090628/090627000015-04db1975ce02092ce7657c3c0e5d737f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.