MODIFICATION
16 -- KC-135 Aircrew Training System (ATS) CLS Support - Revised Documentation after Industry Days
- Notice Date
- 6/19/2009
- Notice Type
- Modification/Amendment
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Hill AFB OO-ALC, OO-ALC/PKXB, 6038 Aspen Ave (Bldg 1289), Hill AFB, Utah, 84056
- ZIP Code
- 84056
- Solicitation Number
- FA8223-10-R-135TS
- Response Due
- 12/4/2008
- Point of Contact
- Lance S Hardman, Phone: (801) 777-6295
- E-Mail Address
-
lance.hardman@hill.af.mil
(lance.hardman@hill.af.mil)
- Small Business Set-Aside
- N/A
- Description
- Service Contract Act (SCA) wage determinations applicable by site. Please note that both Collective Bargaining and SCA Wage Rates may apply to this contract. CBA's have been previously posted and this updated site list shows applicable wage revision references for rates established by the labor department. Please note that Atch 7, VSR specification, contains sensitive technical information and will not be posted to this public venue. Atch 8, 9, 10 and 11 are related to Past Performance information reporting and will be posted in their entirety at a later date. Draft Requirements Traceability Matrix (RTM) which facilitates organization of the proposal/offer and evaluation there-of. Draft Services Delivery Summary for the ATS support program and offers. Revised Total Evaluated Price (TEP) worksheet. This reflects the revised line item structure, and will facilitate fill-in of fixed unit pricing for evaluation of offers. Revised Fixed Rate Table for fill-ins/offer to be evaluated and used to establish fixed rate agreement applicable to pricing of future changes and mods (ECPs/CCPs) not defineable at the outset. Previous version should be discarded. KC-135 ATS Training Site List Substantial revisions to the PWS as a result of exchanges with industry (Industry Days), at Altus AFB 20 Apr and the technical conference at McConnell AFB, 15 Jun 09 (VSR), and on-going plan reviews within the Air Force. This is rev 7 of 7 Jun 09 - previous draft versions of this and other documentation should be discarded. Model Contract, draft line item structure, clauses and provisions. Sections L and M are still in review/preparation. As with many of the draft documents/attachments/worksheets, this only depicts the first year. Final decision as to 5 years, 10 years, or in between will dictate final revisions to these line items and other schedules.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8223-10-R-135TS/listing.html)
- Place of Performance
- Address: Multiple locations, CONUS and OCONUS, United States
- Record
- SN01850646-W 20090621/090619235738-5dc1d710e2e5bd7c60bdf424cc1a756c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |