Y -- RECOVERY - CHINCOTEAGUE BAY CHANNEL, ACCOMACK COUNTY, VIRGINIA AND MAINTENANCE DREDGING, CHINCOTEAGUE HARBOR OF REFUGE, CHINCOTEAGUE, VIRGINIA

Notice Date
6/18/2009
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Norfolk, 803 Front Street, Norfolk, Virginia, 23510-1096
 
ZIP Code
23510-1096
 
Solicitation Number
W91236-09-B-0015
 
Archive Date
8/11/2009
 
Point of Contact
Tracey J. Hughes, Phone: 757-201-7131
 
E-Mail Address
Tracey.J.Hughes@usace.army.mil
(Tracey.J.Hughes@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
PRESOLICITATION NOTICE TIMEFRAME SHORTENED SOLICITATION AVAILABLE 26 JUNE 2009 BID OPENINGING DATE: 27 JULY 2009 Project Description - The entire work for this contract consists of dredging two locations as part of the American Recovery and Reinvestment Act (ARRA). All ARRA funds must be expended by 30 September 2010. The first location of work, Part 1, consists of maintenance dredging the Chincoteague Bay Channel to a required depth of 6 feet MLLW (NOS) with one foot of allowable overdepth. The work shall be performed by a hydraulic dredge and pipeline with all dredged material transported and placed in the designated Government-furnished upland placement area only. The work involves dredging approximately 17,000 cubic yards of material, including allowable overdepth dredging and estimated accretion to September 2009. The second location of work, Part 2, consists of maintenance dredging the Chincoteague Harbor of Refuge to a required depth of 9 feet MLLW (NOS) with one foot of allowable overdepth dredging. The work shall be performed by a hydraulic dredge and pipeline with all dredged material transported and placed in the designated Government-furnished upland placement area only. The work involves dredging approximately 7,000 cubic yards of material including allowable overdepth dredging and estimated accretion to September 2009. CLIN 0001 - Part 1, Maintenance Dredging Chincoteague Bay Channel - Begin performance within 15 calendar days and complete all work within 60 calendar days of receipt of Notice To Proceed (NTP). CLIN 0002 - Part 2, Maintenance Dredging Chincoteague Harbor of Refuge - Begin performance within 15 calendar days and complete all work within 45 calendar days of receipt of Notice To Proceed (NTP) LIQUIDATED DAMAGES: $400.00 MAGNITUDE OF CONSTRUCTION: $250,000.00 - $400,000.00
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA65/W91236-09-B-0015/listing.html)
 
Place of Performance
Address: ACCOMACK COUNTY, VIRGINIA AND CHINCOTEAGUE, VIRGINIA, Virginia, United States
 
Record
SN01849195-W 20090620/090618235505-fe1c29c694c3cb7c3f919857425c7af2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.