AWARD
M -- RECOVERY--M--MODIFICATION NOTICE - OPERATION AND MAINTENANCE OF GOVERNMENT-OWNED FACILITIES AND EQUIMENT, WEST POINT LAKE, GEORGIA
- Notice Date
- 6/15/2009
- Notice Type
- Award Notice
- NAICS
- 561210
— Facilities Support Services
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, US Army Engineer District, Mobile, US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
- ZIP Code
- 36628-0001
- Solicitation Number
- W91278-09-21-ARRA
- Archive Date
- 8/19/2009
- Point of Contact
- Helene Mitchell, 2514416531<br />
- E-Mail Address
-
US Army Engineer District, Mobile
(helene.s.mitchell@sam.usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W91278-06-C-0003 P00045
- Award Date
- 6/15/2009
- Awardee
- Anderson Construction Company, 58 Crozier Lane, Fort Gaines, GA 39851
- Award Amount
- 1753367
- Line Number
- 0006-0017
- Description
- This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). The modification will require the contractor to: 1) Upgrade three (3) campgrounds to 50 amp electrical service and upgrade 11 primitive campsites to utility hookup sites; 2) Increase routine grounds, buildings, and facilities maintenance to include grass mowing, cleaning services, refuse removal, and minor repairs to accommodate the anticipated summer increase in campers; 3) Perform maintenance on 10 existing toilet buildings; 4) Prepare site for a pre-fab toilet building to be located below the dam near a high use fishing area; 5) Plan, layout and construct in-park water service connections for two (2) parks to adjacent public water sources; 6) Use existing plans to construct a new gatehouse, park attendant site, and landscape adjacent grounds at the entrance to Amity Campground; 7) Convert six (6) existing vault toilets to waterborne facilities; and 8) Replace shingle roofing with metal roofing on seven (7) picnic shelters. Additional rationale for issuing modification to existing contract: 1) A detailed scope of work can not be prepared. The extent of the work and the resources needed can not be fully determined prior to starting the work, because conditions are different at each area. 2) The contractor is responsible for the complete inspection, maintenance, and repair of all project buildings and structures in 31 recreation areas, three operations areas, and the Project Management Office. 3) The scheduling, coordination, quality assurance and/or subcontracting for the work to be performed are within the scope of the original contract technical provisions and must be accomplished under the terms of the existing contract. The incumbent contractor not only has the management, technical, and administrative skills to efficiently and effectively accomplish this work at a reasonable cost, but also the advantage of the flexibility to readily adjust to any unforeseen obstacles encountered during installation. 4) This contract enables repairs to begin immediately after and during inspections without a detailed scope of work and thus minimizes the time the facilities are closed and the impact on public access to camping and recreation during the busiest season of the year.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-09-21-ARRA/listing.html)
- Record
- SN01844555-W 20090617/090615234433-e9b695e13bf6fb4e728df5374159870f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |