SOLICITATION NOTICE
Z -- Recreation Building Ceiling Installation
- Notice Date
- 6/12/2009
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238390
— Other Building Finishing Contractors
- Contracting Office
- Department of Labor, Employment Training Administration, Muhlenberg Career Dev. Center, 3875 State Route, Highway, 181 North, Greenville, Kentucky, 42345
- ZIP Code
- 42345
- Solicitation Number
- 69590
- Point of Contact
- James R. Hill, Phone: 2703773253, Glen Embry, Phone: 270-377-3255
- E-Mail Address
-
hill.ralph@jobcorps.org, embry.glen@jobcorps.org
(hill.ralph@jobcorps.org, embry.glen@jobcorps.org)
- Small Business Set-Aside
- N/A
- Description
- Building 1407: Remove 256 SF of old ceiling in the main recreation area and 216 SF in the male and female bathrooms. Install drywall type ceiling the main recreation area and the male and female bathrooms approximately 472 SF. Install a suspended acoustic ceiling tile under the existing gypsum board ceiling at a level of 10 feet high from the floor. Area covers approximately 6,000 SF. Install insulation above the suspended ceiling in an area of approximately 6,000 SF Install new ductwork connecting to existing ductworks, with the same amount and same placement within the 6,000 SF areas. Remove and reattached existing fire alarm system at the level of the new ceiling meet fire code requirements. Install new light fixtures with T-5 ballasts. Paint all new drywall ceiling to color chosen by center with one primer coat applied prior to paint being applied. Newly installed ceiling tile is required to be fire rated type tile and an extra 10% to be supplied to the maintenance department with name, type, color and location that tile was purchased. Contractor is responsible for any storage requirements for materials during the project. Contractor is responsible for the removal of construction debris from the Center and proper disposition of these items in a land fill or recycling whenever possible. Contractor is responsible for provided warranty (Warranty will not begin until work is accepted from the contractor by the Center) for both units and training of the Maintenance staff on the equipment (Contractor will deliver two (2) copies of the Operations and Maintenance Manual to the Center at the time of training). Touch up painting required to return the walls to the existing condition prior to the removal and installment of new ceilings is the responsibility of the Contractor. Low VOC emitting paints and enamels will be used to ceiling. Contractor will provide one gallon of each paint, enamel, sealer to the Maintenance Department along with any tinting formulas used and the vendor where the paints/stains were mixed.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOL/ETA/Muhlenbergjcc/69590/listing.html)
- Place of Performance
- Address: Muhlenberg Job Corp Center, 3875 State Route Highway 181 North, Greenville, Kentucky, 42345, United States
- Zip Code: 42345
- Zip Code: 42345
- Record
- SN01843272-W 20090614/090612235028-e1796b715030db2f0653743d8f446381 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |