59 -- PAS-CRAN-403 Disconnect Switch Relocation, ECP-1693 - Request for Quote

Notice Date
6/8/2009
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
 
ZIP Code
36201
 
Solicitation Number
ANCDF-RFQ-WA9-2189
 
Archive Date
6/30/2009
 
Point of Contact
John Danielson, Phone: 2562380721
 
E-Mail Address
john.danielson@wancdf.com
(john.danielson@wancdf.com)
 
Small Business Set-Aside
N/A
 
Description
ANCDF-RFQ-WA9-2189 Provide all labor, materials to relocate the existing disconnect switch for PAS-CRAN-403 crane from the present location inside the Stack Monitor House to a location on the walkway at EL. 144'-3" directly below and within sight of the crane runway conductors. The scope of work includes, but is not limited to: Electrical: 1.1 Apply Lockout/Tag-outs to 50A circuit breaker for PAS-CRAN-403 in the existing SPS-MCC-111 480V MCC to ensure that all energy sources are removed for equipment that is to be worked on in accordance with WA procedure SAF-2.25. 1.2 Remove input, output power cables and conduits from the existing PAS-CRAN-403 disconnect switch located in stack monitor house 75-461. 1.3 Relocate the existing PAS-CRAN-403 disconnect switch from the present location inside the stack monitor house 75-461 to a location on the walkway at EL. 144'-3" directly below and within sight of the crane runway conductors. 1.4 Install 1-1/2"-inch conduit from the existing cable tray PT6-034 to the existing the disconnect switch located at new location (Column 5D). 1.5 Reroute existing cable in new 1-1/2" conduit to the disconnect switch located at new location (Column 5D) and terminate the cable as shown on attached WA Sketch No SK04-AN-6-E-509-SC and drawing AN-6-E-501-SC. 1.6 Install 1-1/2"-inch conduit from the existing Bridge Crane control box conduit to the existing the disconnect switch located at new location (Column 5D). 1.7 Reroute existing cable in new 1-1/2" conduit to the disconnect switch located at new location (Column 5D) and terminate the cable as shown on attached WA Sketch No SK04-AN-6-E-509-SC and drawing AN-6-E-501-SC. 1.8 Conductors shall be color coded or identified with phase tape as follows: Voltage Conductor Color 277/480V A Phase Brown B Phase Orange C Phase Yellow Ground Green 1.9 All wall penetrations shall be sealed. A sealing material such as "Fire Foam" should be employed. 1.10 All electrical connections shall be in accordance with NEC Article 110.14 1.11 After job has been completed, remove the LO/TO. General: 1. All testing and inspections to ensure that the final installation performs as designed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/3506ddd6e07dcee048f703b7595c5c58)
 
Record
SN01838691-W 20090610/090608234920-3506ddd6e07dcee048f703b7595c5c58 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.