Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 29, 2009 FBO #2741
MODIFICATION

A -- PV Technology Incubator

Notice Date
5/27/2009
 
Notice Type
Modification/Amendment
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
Department of Energy, Alliance for Sustainable Energy, LLC (DOE Contractor), National Renewable Energy Laboratory, 1617 Cole Boulevard, Golden, Colorado, 80401
 
ZIP Code
80401
 
Solicitation Number
RAT-9-99013
 
Archive Date
7/28/2009
 
Point of Contact
William L. Algiene, Phone: 303.384.7423, Patrick Schurott, Phone: 303.275.3132
 
E-Mail Address
william.algiene@nrel.gov, patrick.schurott@nrel.gov
(william.algiene@nrel.gov, patrick.schurott@nrel.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
The National Renewable Energy Laboratory (NREL) has issued a Solicitation for Letters of Interest (LOI) to U.S. Small Businesses for the development of prototype photovoltaic (PV) modules and pilot production. This LOI is in support of U.S. Department of Energy (DOE) and represents a significant enhancement of DOE's business strategy of partnering with the U.S. industry to accelerate commercialization of PV system research and development (R&D) to meet aggressive cost and installed capacity goals. This Solicitation is targeted at innovative R&D on PV cell and module prototypes with demonstrated functionality in either large-area cell/module form or, preferably, prototypes produced in pilot-scale operations. The emphasis on proposed activities should be on the barriers to manufacturing scale-up and 2012 commercialization. The primary objective of this program is to shorten the timeline for companies to transition prototype and pre-commercial PV technologies into pilot and full-scale manufacture. Responders to this Solicitation are expected to focus their efforts on a limited number of high impact areas that lie on the critical path to scaling-up their technology to full manufacture. The minimum entrance criterion is demonstrated PV cells or process lab devices or modules. The successful exit criterion is for prototype modules and pilot production demonstration >5MW/year. Subject to the availability of funds, it is anticipated that 6 to 10 subcontracts, up to $3M each, will be awarded as 18-month phased subcontracts. A Net Conference regarding the project is scheduled for Tuesday, June 16, 2009, 9:30 A.M. Mountain Time. The Solicitation is available to view/download from NREL's website at: http://www.nrel.gov/business_opportunities/solicitations_rfps.html. Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2009-02-20 15:54:04">Feb 20, 2009 3:54 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2009-05-27 13:19:59">May 27, 2009 1:19 pm Track Changes
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/NREL/NR/RAT-9-99013/listing.html)
 
Place of Performance
Address: Alliance for Sustainable Energy, LLC, Management and Operating Contractor for the National Renewable Energy Laboratory (NREL), Golden, Colorado, 80401, United States
Zip Code: 80401
 
Record
SN01828466-W 20090529/090527235702-8fc1768c8e0c45aaedfa196a72299b44 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.