Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 28, 2009 FBO #2740
SOLICITATION NOTICE

Y -- AZ ERFO 39-1(8), General Hitchcock Highway, Coronado National Forest, Pima County, Arizona

Notice Date
5/26/2009
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-09-B-00028
 
Archive Date
9/10/2009
 
Point of Contact
Brenda J McGehee, Phone: 720-963-3353, Tiffany C Atchison, Phone: 720-963-3354
 
E-Mail Address
brenda.mcgehee@fhwa.dot.gov, tiffany.atchison@fhwa.dot.gov
(brenda.mcgehee@fhwa.dot.gov, tiffany.atchison@fhwa.dot.gov)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DETAILS: The project is located approximately 15 miles northeast of Tucson, AZ on Arizona Forest highway 39, know locally as the Mt Lemmon Highway. Project length is 0.06 miles. Work includes spot repairs at two locations. Site MP 9.8 includes constructing a new 60 ft bridge with pre-stressed concrete box beams; asphalt paved ditch and shotcrete waterway; class 6 riprap; 15” and 5” concrete curb; and guardrail replacement. There is approximately 1700 yd3 of roadway excavation, probably requiring controlled blasting techniques. The existing MSE wall will need to be repaired or removed as necessary to construct the bridge. Some of the existing temporary fix of soil nails and shotcrete will need to be removed as well. MP 10.5 work includes a 42” culvert removal and replacement with a 42” culvert and concrete inlet; class 5 riprap; 5” concrete curb; remove and reset guardrail; and MSE wall removal and reconstruction as necessary to install new culvert. The estimated cost is $ 1 to 2 million and we expect construction work to start early September 2009 and finish around February 2010. There are possible Mexican Spotted owls & Peregrine Falcons nesting within the project limits that will restrict construction activities. This is a difficult construction project in a short construction season located in very steep and rocky terrain. No formal detailed road closures, except for 30 minute delays, will be in effect as all construction activities will require maintaining existing traffic flow.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-09-B-00028/listing.html)
 
Place of Performance
Address: Coronado National Forest, Tucson, Arizona, United States
 
Record
SN01826955-W 20090528/090526234911-78a6e507b0f6d0d9e1196f13b1efba44 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.