Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 15, 2009 FBO #2727
MODIFICATION

Y -- PROSSER WATER SYSTEM

Notice Date
5/13/2009
 
Notice Type
Modification
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
631 Coyote Street Nevada City CA 95959-2250
 
ZIP Code
95959-2250
 
Solicitation Number
AG-9A63-S-09-0042
 
Response Due
5/21/2009
 
Archive Date
6/30/2009
 
Point of Contact
Wendy Whiteman, Contracting Officer, Phone 530-478-6142, Fax 530-478-6126, - Rebecca A Peabody, Procurement Technician, Phone 530-478-6124, Fax 530-478-6126
 
E-Mail Address
wwhiteman@fs.fed.us, rpeabody@fs.fed.us
 
Small Business Set-Aside
Service-Disabled Veteran-Owned
 
Description
This project is set-aside for Service-Disabled Veteran-owned Small Businesses. It is estimated that the solicitation for this project will be posted electronically on April 22, 2009. Contractors will have electronic access to this solicitation at this website. No hard copies will be mailed. Technical questions should be addressed to the contact listed in the solicitation when it becomes available. This project involves replacing existing galvanized waterlines at Lakeside, Prosser Family, and Prosser Group Campgrounds with approximately 2900 feet of new High Density Polyethylene (HDPE) pipe of various sizes, removing existing hydrants, and installing 17 new campground hydrants. One new air release valve will be needed. A small amount of cutting and replacing asphalt concrete will be needed to cross one road. OPTION: The option involves replacing approximately 180’ of existing 6” asbestos-concrete pipe with new 4” HDPE pipe under Prosser Road. This requires cutting and replacing asphalt concrete on the road. Additionally, all the valves, drains, and unions at the connection point will need to be replaced. The contractor will need to submit a traffic control plan. The existing 6” asbestos concrete pipe and disconnected service lines will be capped and abandoned in place. Project Location From Truckee, CA, take Highway 89 north 3.1 miles and turn right (east) at the sign for Prosser Campground. The Lakeside Campground is one mile down Prosser Road, the Prosser Family Campground is 1.5 miles in, and the Group Campground is 1.7 miles in. (All are on the north side of the main road and on the south side of Prosser Reservoir.) The Government's estimate is: $100,000 and $250,000. Estimated Start Date September 8, 2009 NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (13-MAY-2009); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USDA/FS/9A63/AG-9A63-S-09-0042/listing.html)
 
Place of Performance
Address: TRUCKEE, CA
Country: US
 
Record
SN01816145-F 20090515/090513233047 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.