SOLICITATION NOTICE
99 -- Material Distribution Services at the Defense Distribution Center Jacksonville, Florida (DDJF) - Amendment 3
- Notice Date
- 4/29/2009
- Notice Type
- Modification/Amendment
- Contracting Office
- Defense Logistics Agency, DLA Acquisition Locations, Defense Distribution Center, 2001 Mission Drive, DDC CSS-AB, Bldg 404, New Cumberland, Pennsylvania, 17070-5001, United States
- ZIP Code
- 17070-5001
- Solicitation Number
- SP3100-09-R-0010
- Point of Contact
- Gary G. Walls,
- E-Mail Address
-
Gary.Walls@dla.mil
- Small Business Set-Aside
- N/A
- Description
- Amendment 0003 TE 5.0 APLs-Updated April 28, 2009 TE 3.3 MHE-Updated April 28, 2009 TE 3.1-Updated April 28, 2009 Attachment J.2-Updated April 28, 2009 Attachment J.1-Updated April 28, 2009 Attachment J-2-Section 6.6.N Mandatory Reports Link to Attachment J-1-Section 6.6.1 Monthly Reports 1. Solicitation SP3100-09-R-0010 has been amended as follows. a. Under Attachment J.1- Section C-Performance Work Statement, update the following Sections: Section and Title 3.5 Government-Furnished Training- Change to Training Requirements. 5.1 Distribution Services and Performance Requirements-Added BRAC information for planning purposes. 5.2.1.1 Inbound Traffic Management-Updated to include information from 27 Feb 09 Truck Control Policy. 5.2.1.4.2 Customer Returns-Revise Language to clarify Kind, Count, and Condition (KCC) requirements. 5.2.2.8 Frustrated Material-Adds the requirement to process frustrated material within 10 calendar days of receipt. 5.5.1.3 Denial Research-Updates to Contractor’s denial research. 5.5.1.7.5 Demilitarization (DEMIL)-Updated to include information from 17 Apr 09 letter for DEMIL Code F, G, and P Disposal Orders. b. Under Attachment J.1-Performance Work Statement, Section C-7 Technical Exhibits (TEs), update the following TEs: Technical Exhibit TE 3.1 GFFUpdated based on Building 110 staying. TE 3.3 MHERevised to delete items that were listed twice. TE 5.0 APLsUpdated APLs. c. Under Attachment J.2 - Supplement to Attachment J-1-Section C – Site Specific Requirements, update the following Sections: Section and Title 1.1.1N Navy Warehouse Transition-Updated to reflect the latest information from the Navy. 5.5.2.10 N Depot Level Repairables with Project Code Z17-Adds a new paragraph to Attachment J-2 d. The links to Attachment J-1-Section 6.6.1 Monthly Reports, and Attachment J-2- Section 6.6N Mandatory Reports are attached. 2. Changes in the SOW, TEs, and Site Specific Requirements are marked with a line in the right margin or with a strikethrough line in the document. 3. Updated versions of Section J.1, J.2, and the Technical Exhibits (TEs) are attached as follows: Attachment J.1-Updated April 28, 2009 Attachment J.2-Updated April 28, 2009 TE 3.1 GFF-Updated April 28, 2009 TE 3.3 MHE-Updated April 28, 2009 TE 5.0 APLs-Updated April 28, 2009
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=1f2cadffb9bf18252dceee0f0f714e2f&tab=core&_cview=1)
- Record
- SN01805285-W 20090501/090429223312-1f2cadffb9bf18252dceee0f0f714e2f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |