SOLICITATION NOTICE

66 -- Explosive Decompression Test Facility - Site Pictures

Notice Date
3/31/2009
 
Notice Type
Modification/Amendment
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting), 3001 Staff Drive, Ste 1AG76A, Tinker AFB, Oklahoma, 73145-3015
 
ZIP Code
73145-3015
 
Solicitation Number
FA8125-09-Q-0076
 
Archive Date
5/17/2009
 
Point of Contact
Michelle Syth, Phone: 4057394032
 
E-Mail Address
michelle.syth@tinker.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
Site Pictures The following are questions that arose during the site visit on 23 March 2009 along with the answers: 1. Can any of the existing electrical disconnect boxes be relocated or deleted? ANS. The disconnect labeled "Breaker Box for The Circulation Pump" has power running to it however it is no longer connected to a load so it can be removed along with the feed running to it. ANS. The disconnect labeled for the Vibration System is located just north of the Circulation Pump Disconnect. This disconnect is in use but it will be moved approximately 6 ft north along the west wall and reinstalled there. ANS. The disconnect which powered the chiller and is now the source of power for the blower/sucker fan will require reinstallation to the north approximately 8 feet. 2. If the large air duct can be relocated? ANS. The large air duct can be relocated to the north and reconnected to the blower/sucker fan in its present location provided C.E. grants permission for the additional penetration of the wall and the old vacant hole is properly sealed to their standards. 3. Can the chilled water lines be relocated to the south wall? ANS. In room 119 the chill water lines can be located to the south wall if they are then run north into the trench as they provide cooling for the shaker and the environmental chamber via their path through the trench. 4. Will there be a requirement for any pass-thru conduit to the outside? ANS. I see the possible necessity for two conduits. One would be for transducer wiring from the accumulator tank, air duct, and vacuum pumps to the control system located in room 119. The other would be for a compressed air line if the design calls for pneumatic actuators to be used on the system. 5. Can we either come out and take some photo's or if Mr. Fleenor has already taken some can he send them to us? ANS.I have provided the photos which I took and annotated to Michelle Syth. She will make copies available in accordance with their procedures. If she or her supervisors have no objections I am agreeable to someone coming to take additional photos, measurements, or asking questions whenever I am present. **The photos are posted as an attachment to this notice**
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=8ed5ab240b251e14f31966a279d8ad8b&tab=core&_cview=1)
 
Place of Performance
Address: Tinker AFB, Tinker AFB, Oklahoma, 73145, United States
Zip Code: 73145
 
Record
SN01781631-W 20090402/090331220915-083816b92114bd090a339a0ab69e0f85 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.