SOLICITATION NOTICE
J -- Trailer repairs, Dixon, CA
- Notice Date
- 3/13/2009
- Notice Type
- Modification/Amendment
- Contracting Office
- Department of the Interior, U. S. Geological Survey, U. S. Geological Survey, U S GEOLOGICAL SURVEY, APS BRANCH OF ACQUISITION AND GRANTS3020 STATE UNIVERSITY DR. EAST, MODOC HALL STE 2002 SACRAMENTO CA 95819
- ZIP Code
- 95819
- Solicitation Number
- 09WRQQ0068
- Archive Date
- 3/13/2010
- Point of Contact
- STEWART EVANS CONTRACTING SPECIALIST 9162789334 ;<br />
- Small Business Set-Aside
- Total Small Business
- Description
- This modification does not materially alter the requirement therefore the response date remains the same. Vendors are highly encouraged to schedule a site visit IAW RFQ 09WRQQ0068 as a 6' chain link fence next to private property is located about one foot from the west side of the trailer. The clause at 52.236-3, Site Investigation and Conditions Affecting the Work (APR 1984) is added to the solicitation in full text. Site Investigation and Conditions Affecting the Work (Apr 1984) (a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to(1) conditions bearing upon transportation, disposal, handling, and storage of materials;(2) the availability of labor, water, electric power, and roads;(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;(4) the conformation and conditions of the ground; and(5) the character of equipment and facilities needed preliminary to and during work performance.The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract. (End of Clause)
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=70df723c7b8453cc42835e8a9d5e1f57&tab=core&_cview=1)
- Record
- SN01769026-W 20090315/090313220140-70df723c7b8453cc42835e8a9d5e1f57 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |