Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 04, 2008 FBO #2504
SOLICITATION NOTICE

Y -- Install Swimming Pool Liner in Bldg 440 on Naval Station Great Lakes, IL

Notice Date
10/2/2008
 
Notice Type
Presolicitation
 
NAICS
713940 — Fitness and Recreational Sports Centers
 
Contracting Office
Department of the Navy, Naval Facilities Engineering Command, NAVFAC MIDWEST PWD GREAT LAKES FEAD, N40083 NAVFAC MIDWEST PWD GREAT LAKES FEAD 201 Decatur Avenue Bldg 2016 Great Lakes, IL
 
ZIP Code
00000
 
Solicitation Number
N4008309Q3000
 
Point of Contact
Robert Kellner 847-688-5395 ext 257
 
Small Business Set-Aside
Total Small Business
 
Description
The Contractor shall provide including all labor, material, transportation, equipment, and supervision required to install a single ply a heavy duty commercial liner, with lap lines, and depth clearly marked and seams shall be installed with adhesive in the pool Building 440, Naval Station Great Lakes, IL as described and shown in this specifications and drawing. Owner chosen colors. A minimum of 10 year factory warranty and one year installation warranty. All work is to be performed in an occupied facility, where the contractor will be required to coordinate with the Contracting Officer to complete thework. The contractor will also be required to coordinate work and apply temporary controls to ensure utilities (i.e. electrical, mechanical, plumbing, etc) for completed workareas and non-work areas are not interrupted except as provided for utility cutovers in the specification's work restrictions. a. Include all labor and material costs to install single ply liner white color fully adhesive in the pool wall and floor.b. 30 days construction time is critical to customer operation.c. The 30 days can be worked out in 15 November to 30 December timeframes.d. Submit samples and product documentation with the proposal.e. NAVFAC Midwest will drain the pool water clean the pool walls and floor.f. Contractor will prepare the pool walls and floor to install new pool liner.g. Finish concrete surface and follow all ASTM standards.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=145247370891215f0031987af483e846&tab=core&_cview=1)
 
Record
SN01687442-W 20081004/081002220951-145247370891215f0031987af483e846 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.