SOLICITATION NOTICE
43 -- VACUUM CHAMBER SYSTEM
- Notice Date
- 9/11/2008
- Notice Type
- Modification/Amendment
- NAICS
- 333912
— Air and Gas Compressor Manufacturing
- Contracting Office
- NASA/Goddard Space Flight Center, Code 210.M, Greenbelt, MD 20771
- ZIP Code
- 20771
- Solicitation Number
- NNG08265500Q
- Response Due
- 9/16/2008
- Archive Date
- 9/11/2009
- Point of Contact
- Yolanda A. Williams, Contract Specialist, Phone 301-286-4239, Fax 301-286-1720, />
- E-Mail Address
-
Yolanda.A.Williams@nasa.gov<br
- Small Business Set-Aside
- Total Small Business
- Description
- THIS NOTICE CONSTITUTES AMENDMENT NO. 002 TO THECOMBINED SYNOPSIS/RFQ FOR VACUUMCHAMBER SYSTEM. Companies shall acknowledge all amendment(s) in their quote. This noticeserves as the official amendment to subject synopsis/RFQ and a written amendment will notbe issued.The purpose of this amendment is to answer offeror's questions.Q1) Specified "inside surface finish" for the vacuum chamber? Will Electro Polishing be required? A1) Required or better Q2) What is the minimum pumping speed requirement for the Rotary Turbo pump? A2) N2: 145 (307) l/sec (cfm) He: 135 (286) H2: 115 (244) or better Q3) What is the desired voltage for the Rotary Turbo pump? A3) 110 volts Q4) Is there a preferred brand for the Rotary Turbo pump? A4) No. As specified in the solicitation, this solicitation is open to received quotes for brand name or equal. Q5) What is the minimum pumping speed requirement for the Oil free mechanical Rough/backing pump? A5) 10.6 cfm Q6) What is the desired voltage for the Oil free mechanical Rough/backing pump?A6) 110 volts Q7) Is there a preferred brand for the Oil free mechanical Rough/backing pump?A7) No Q8) Is there a preferred brand for the pressure gage controllers, Ion gages and Thermo-couple gages?A8) No Q9) Should the6" CF gate valve be electrically actuated or Pneumatically actuated? Is there a preferred brand for the 6" CF Gate Valve?How many valves are required? A9) Manually actuated, no preferred brand, 1 6 gate valve, 3 KF25 valvesQ10) Are there any brands that we are not allowed to use? A10) No. As specified in the solicitation, this solicitation is open to received quotes for brand name or equal. Q11) What is the minimum required warranty for the system?A11) One year Q12) Will the vacuum chamber sit on a bench or will it be suspended?A12) Suspended Q13) Will the Turbo Rotary pump pump be mounted directly onto the chamber or does it need a vacuum hose or bellows to connect to the chamber? If a hose or bellows is required, how long would it have to be?A13) Turbo rotary pump will be connected to chamber by 6 gate valve Q14) At what distance from the Rotary Turbo pump will the Oil free mechanical Rough/backing pump be placed ?A14) Undetermined Q15) Is there a minimum pumpdown time(s) requirement(s) for any specific vacuumlevel(s)?A15) NoQ16) Is this a machine currently in use?A16) NoQ17) Also, what is the chamber being used for?A17) Vacuum storage of MCP and testing with UV sourceThe due date for receipt of offers is not extended.Companies shall provide the information stated in the synopsis/RFQ posted on the NASAAcquisition Internet Service (NAIS) on September 2, 2008. Documents related to thisprocurement are available over the Internet. These documents reside on a World Wide Web(WWW) server which may be accessed using a WWW browser application. The Internet site, orURL, for the NASA/GSFC Business Opportunities home page ishttp://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=51
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=8d460f4b0ca2290e203317bfcf922b59&tab=core&_cview=1)
- Record
- SN01667419-W 20080913/080911225637-8d460f4b0ca2290e203317bfcf922b59 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |