SOLICITATION NOTICE
A -- Mobile Ad hoc Interoperability Network GATEway (MAINGATE)
- Notice Date
- 7/23/2008
- Notice Type
- Modification/Amendment
- NAICS
- 541712
— Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- Contracting Office
- Other Defense Agencies, Defense Advanced Research Projects Agency, Contracts Management Office, 3701 North Fairfax Drive, Arlington, Virginia, 22203-1714
- ZIP Code
- 22203-1714
- Solicitation Number
- BAA08-21
- Response Due
- 5/29/2009
- Archive Date
- 6/13/2009
- Point of Contact
- BAA08-21,,
- E-Mail Address
-
BAA08-21@darpa.mil
- Small Business Set-Aside
- N/A
- Description
- Amendment 4 to BAA08-21 Mobile Ad hoc Interoperability Network GATEway (MAINGATE) The purpose of Amendment 4 to BAA08-21 Mobile Ad hoc Interoperability Network GATEway (MAINGATE) is to make the following changes: 1. Page 4, Part One, Overview information, change the PROPOSAL DUE DATE from 28 July 2008 to 26 August 2008. 2. Pages 15, replace section 1.1.8 entitled Oral Presentation and Demonstration Expectations, in its entirety with the following: The proposer is requested to plan for an oral presentation in Washington, DC, which will include a discussion of all testing and experimental results showing technical maturity of their proposed hardware, based on the TRL guidance in Appendix A, in support of the technical and cost proposal evaluation. This event will occur not later than 30 days following proposal submission, or a time negotiated between DARPA and the proposer. The oral presentation is limited to 4 (four) hours total. The oral presentations should address at a minimum, discussions of TRL assessments, supportive documentation, and determination of the proposed components. Test data for TRL 6 components/subsystems should be documented in sufficient detail and in a form that the review team can assess the testing methods, statistical significance of the tests, and results for each component/subsystem proposed for the MAINGATE node. This information should follow the guidance given in Appendix A. This oral presentation time is not for discussion or clarification of the full proposal. However, the government may ask questions on proposals to help clarify any issues brought up during initial proposal review. The oral presentations should show that the proposer has met the basic program entry criteria to prove the proposed equipment, algorithm, network, etc. are mature enough to enter this program. The oral presentation also shall address an initial projection of the unit production cost estimate and discuss the path ahead for achieving the projected unit cost. See Appendix A for the appropriate TRL level description. 3. Page 25, Section 4.4.1, change the proposal due date from 28 July 2008 to 26 August 2008.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=6da0ca978b4d5b0f10f890fdd9d5f55e&tab=core&_cview=1)
- Record
- SN01620921-W 20080725/080723222442-6da0ca978b4d5b0f10f890fdd9d5f55e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |