Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 24, 2008 FBO #2432
SOLICITATION NOTICE

Y -- Tepee Creek Bridge Construction

Notice Date
7/22/2008
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 IDAWY Acquisition Service Center, 1405 Hollipark Drive, Idaho Falls, Idaho, 83401
 
ZIP Code
83401
 
Solicitation Number
AG-02NV-S-08-0082
 
Archive Date
10/30/2008
 
Point of Contact
Kellie Shaw,, Phone: 208-557-5766, Bradley G. Bauer,, Phone: 208-557-5768
 
E-Mail Address
kjshaw@fs.fed.us, bgbauer@fs.fed.us
 
Small Business Set-Aside
Total HUB-Zone
 
Description
This project consists of replacing an existing 50” culvert with a government supplied timber bridge with timber abutments. The existing culvert crossess Tepee Creek under the Kinky Creek road. The bridge is 16 feet wide with a 28 foot span and is located at the Greys River Ranger District office at 671 N. Washington Street, Afton, Wyoming. This project also involves hauling and placing approximately 200 cubic yards of local pit run material for 500 feet on the west approach to the new bridge. The contractor shall furnish all labor, equipment, tools, supervision, supplies, materials and quality control necessary to divert the existing creek, remove the existing culvert, construct the bridge, and shape the approaches and roadway adjacent to the replacements. An option item will be included in the solicitation to replace another culver 62” x 72” arch with a government supplied timber bridge with timber abutments. The existing culvert passes Gypsum Creek under the Middle Gypsum road. The bridge is the same dimensions as the Tepee Creek bridge and is also located at the Greys River Ranger District.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=09044ef10bdb565a0646e805d7dec761&tab=core&_cview=1)
 
Place of Performance
Address: The project is located on the Pinedale Ranger District, Bridger-Teton National Forest, Sublette County, Wyoming. The contract will be 360 calendar days. This project is estimated to begin fall 2008/spring 2009. Quotes are due at 3:00 p.m. MST, September 5, 2008. The estimated price range is $100,000 and $250,000. There will be an organized site visit for the project on August 13, 2008. The solicitation will be available on approximately August 5, 2008, and can be downloaded from this site at that time. All responsible vendors shall be registered in the Central Contractor Registration database. All responsible sources may submit an offer that will be considered. The proposed project listed here is a HUBZone set-aside., Pinedale, Wyoming, 82941, United States
Zip Code: 82941
 
Record
SN01619636-W 20080724/080722222744-09044ef10bdb565a0646e805d7dec761 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.