Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 13, 2008 FBO #2421
SOLICITATION NOTICE

Z -- Coastal Erosion Control, Unalakleet, Alaska

Notice Date
7/11/2008
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, US Army Corp of Engineers - Alaska, ATTN: CEPOA-CT, P. O. Box 6898, Elmendorf AFB, Alaska, 99506-6898
 
ZIP Code
99506-6898
 
Solicitation Number
W911KB-08-B-0008
 
Response Due
9/4/2008
 
Archive Date
11/30/2008
 
Point of Contact
Roger D Williams,, Phone: 907-753-5571, Christine A. Dale,, Phone: 907 753-5618
 
E-Mail Address
r.david.williams@usace.army.mil, christine.a.dale@usace.army.mil
 
Small Business Set-Aside
N/A
 
Description
A Request for Proposal in electronic format only will be available for download on or about August 4, 2008 at www.fbo.gov No disks shall be mailed. Any resulting contract will be firm-fixed priced. The North American Industrial Classification System code is 237990, which has a size standard of $31.0 million in average annual receipts. Joint ventures must also be registered in CCR as a joint venture. We advise contractors begin this process as soon as possible should they be selected for the award. The solicitation shall be issued on a competitive sealed bid basis. The government shall not be responsible for bid preparation costs in the event the solicitation is canceled. The requirement for the submission of both performance and payment bonds, in an amount equivalent to 100% of the award price and a bid guarantee for 20% of the bid price or $3,000,000, whichever is less shall be applicable. Therefore, the successful firm shall have the capability to acquire such bonding. The Davis-Bacon Act will apply. DESCRIPTION OF WORK: Construct rock revetment for Coastal Erosion Control at Unalakleet, Alaska, which include: obtaining, delivering, and placing approximately 15,000CY of Core Rock, 16,000 CY of B rock, and 18,000 CY of A rock for the revetment, remove and dispose of existing wood and other debris within the project footprint prior to rock placement, remove/relocate a six-inch outfall line, and other miscellaneous earthwork in the project area. The Contractor will furnish all labor, supplies, and materials to accomplish the work. The Estimated Magnitude of Construction is between $10,000,000 and $25,000,000.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=e62fbb5e31d8dba95048f96e487d526d&tab=core&_cview=1)
 
Record
SN01611803-W 20080713/080711220240-e62fbb5e31d8dba95048f96e487d526d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.