FBO DAILY ISSUE OF APRIL 02, 2008 FBO #2319
MODIFICATION

49 -- Fabricate Trailer Turner for RSMS, Kansas Army National Guard, Ft. Riley, KS

Notice Date
3/31/2008
 
Notice Type
Modification
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
USPFO for Kansas, 2737 South Kansas Avenue, Topeka, KS 66611-1170
 
ZIP Code
66611-1170
 
Solicitation Number
W912JC-08-R-4002
 
Response Due
4/3/2008
 
Archive Date
6/2/2008
 
Point of Contact
linda.ehrhart, 785-274-1542
 
E-Mail Address
USPFO for Kansas
(linda.ehrhart@ng.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Responses to vendor inquiry: 10. The fixture constructed of corrosive resistant metal or coated with a corrosive resistant coating / finish due to weather, water, or humidity. Q. Is Powder coated mild steel acceptable to meet th is requirement? A. Powder Coating is acceptable. 11. Vendor must certify fixture in accordance with accepted industry load bearing standards. Q. Is there any particular certification that needs to be met or is this just st ating that the fixture will be up to industry standards? A. Weight of the heaviest trailer is 11 ton. Fixture must be certified to carry that weight. Simply stating the fixture is up to industry standards is not enough. Note 2: Final plan / drawing must be approved by the customer prior to award of the contract. Q. Should these plans/drawings be submitted to you, and would you like hard copies or electronic, PDF's. Could these be reviewed with the customer for feedback? <BR > A. Electronic PDF is acceptable. The drawings are to be submitted with your proposal to the Contracting Officer by the response date/time. Shop Drawings will be approved prior to Award. Once the contract is awarded and fixture delivered, the Final Drawing will go to the customer. Note 3: Fixture must be complete, delivered and set up within 60 days following the award of contract. Q. 60 days is an extremely short period of time to complete the scope of work called for in this solicitation. Who will be responsible to decide if this time frame has been met, and what are the consequences if it is not met. Is it possible that this Note could be ammended? If so who would make that decision? A. The time period will be ext ended to delivered/setup 120 days from date of contract award. The contracting officer with input from RSMS will make the determination. Q. Is there a way to fill out and submit provision FAR 52.212-3 electronically? I found it and printed it out, but just wondered if there was a way to submit it by E-mail. A. It may be updated yearly at https://orca.bpn.gov/ Online Representations and Certifications Application (ORCA) Q. Would the signature be accepted if it was on an E-mailed PDF? A. Yes NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (31-MAR-2008); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USA/NGB/DAHA14/W912JC-08-R-4002/listing.html)
 
Place of Performance
Address: USPFO for Kansas 2737 South Kansas Avenue, Topeka KS
Zip Code: 66611-1170
Country: US
 
Record
SN01545759-F 20080402/080401073319 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.