SOURCES SOUGHT
Y -- SOURCES SOUGHT: New Single-Family Housing at St. John's Housing at Dugway Proving Grounds, UT
- Notice Date
- 3/6/2008
- Notice Type
- Sources Sought
- NAICS
- 236115
— New Single-Family Housing Construction (except Operative Builders)
- Contracting Office
- US Army Engineer District, Sacramento, 1325 J. Street, Sacramento, CA 95814
- ZIP Code
- 95814
- Solicitation Number
- W91238-08-S-0066
- Response Due
- 3/21/2008
- Archive Date
- 5/20/2008
- Point of Contact
- DAVID DALE ROBBINS, 9165575367
- E-Mail Address
-
Email your questions to US Army Engineer District, Sacramento
(david.d.robbins@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- The Sacramento District of the U.S. Army Corps of Engineers has an upcoming project for the New Family St Johns Housing, which will be performed at Dugway Proving Grounds in Utah with an estimated magnitude range of $3 to $5 Million. The NAICS Code for this project is 236115 with a Small Business Size Standard of $31,000,000.00. This announcement serves only as a market survey/sources sought in order to determine the availability of 8(a), HUBZone, and Service-Disabled Veteran Owned small business c oncerns. PROPOSALS ARE NOT BEING REQUESTED AT THIS TIME. Responses are being sought from qualified 8(a), HUBZone, and Service-Disabled Veteran Owned small business concerns possessing the technical expertise and bonding capability to execute the work req uirements. This project is to demolish eleven existing duplexes in the St Johns Housing area. Existing duplexes contain asbestos and lead base paint. There will be nine newly constructed 3-Bedrooms, 2-Bath, 2000 gross sq ft single story single family h omes with garage on those lots where the demolished buildings were; match existing exterior siding and roof-types. Additionally, there will be two 20-car parking lots on the remaining lots and installation of curb, gutter and sidewalk where needed. All u tilities are to be underground. Refrigerator, oven, stove is to be furnished. There will be a non-electrical energy requirement for propane. Construction is to be completed within 365 calendar days. Interested contractors must submit the following in r esponse to this Sources Sought notice: 1) Proof of bonding capacity in the amount of at least $5M; documentation must be in the form of a statement from the contractors bonding company identifying both the per contract and aggregate bonding limits; 2) Ve rifiable experience (i.e., previous projects) of performing construction of single family housing on federally operated government installations with demolition and abatement efforts; 3) How you will manage work in accordance with FAR 52.219-14(b)(3), Limi tation on Sub-contracting: General Construction(The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials), and 4) statement if you will or will not be able to submit a proposal. The estimated solicit ation issuance dates is mid April, 2008. INTERESTED CONTRACTORS MUST RESPOND TO THIS SOURCES SOUGHT NOTICE NO LATER THAN FRIDAY, 21 March 2008. Responses must be submitted via email to BOTH Betty Williams-Moore and Gregory Tom at Betty.S.Williams-Moore@u sace.army.mil AND Gregory.L.Tom@usace.army.mil.
- Place of Performance
- Address: US Army Engineer District, Sacramento 1325 J. Street, Sacramento CA
- Zip Code: 95814
- Country: US
- Zip Code: 95814
- Record
- SN01526082-W 20080308/080306224738 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |