SPECIAL NOTICE
A -- AIRSPACE CONCEPT EVALUATION SYSTEM SOFTWARE DEVELOPMENT
- Notice Date
- 3/5/2008
- Notice Type
- Special Notice
- NAICS
- 541711
— Research and Development in Biotechnology
- Contracting Office
- NASA/Ames Research Center, JA:M/S 241-1, Moffett Field, CA 94035-1000
- ZIP Code
- 94035-1000
- Solicitation Number
- NASA-SNOTE-080305-001
- Archive Date
- 3/5/2009
- Point of Contact
- Nellie M. Powell, Contracting Officer, Phone 650-604-3003, Fax 650-604-2316, Email Nellie.M.Powell@nasa.gov
- E-Mail Address
-
Email your questions to Nellie M. Powell
(Nellie.M.Powell@nasa.gov)
- Description
- This is a notice for an extension to the current contract for the acquisition of continuing software development for Builds 4 and 5 of the Airspace Concept Evaluation System (ACES) together with maintenance, support and concept assessments for ACES Builds 3 through 5. This amendment to the current contract is to increase the period of performance of the contract by 8 months. The contract end date is March 31, 2008. The increased period of performance will move the end of contract date to November 30, 2008. This amendment is required as a bridge to the new NRA award to be issued. This development is necessary for the NGATS ATM Airspace project to meet milestones AS.4.7.01, AS.3.7.01, AS.3.7.02, AS.2.7.02, AS.1.7.03, and AS.1.7.04. The milestone titles and dates are listed below. Each is dependent on the completion of the earlier one. A revised SOW covers the milestones mentioned above. If there is a lapse in contract, these milestones cannot be met. Milestone AS.1.7.03, ?Develop individual agent-based models of NGATS technologies,? due September 31, 2008. Milestone AS.1.7.04, "Develop interim system-level concept of operations to accommodate 3x demand based on results of studies and identified gaps," due September 31, 2009. Milestone AS.2.7.01, "Develop method for modeling human workload in fast-time simulations, validate models against workload measurements," due September 31, 2010. Milestone AS.3.7.02, "Develop fast-time system-level simulation of NGATS technologies," due September 2010. Milestone AS.3.7.01, "Conduct objective analysis of service provider and aircraft operator separation assurance methods," due September 2010. Milestone AS.4.7.01, "Develop refined system-level concept of operations based on results of modeling, safety, cost-benefits, and human-in-the-loop simulations," due September 2011. It is anticipated that the NRA solicitation cannot be finalized until November 2008.
- Web Link
-
http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=21#129008
- Record
- SN01525151-W 20080307/080305225300 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |