Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 28, 2007 FBO #2223
MODIFICATION

36 -- TEST CHAMBERS

Notice Date
12/26/2007
 
Notice Type
Modification
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
ACA, Aberdeen Proving Ground, Directorate of Contracting, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013
 
ZIP Code
21005-3013
 
Solicitation Number
W91ZLK-08-T-0083
 
Response Due
12/27/2007
 
Archive Date
2/25/2008
 
Point of Contact
Susan Sowa, 410-278-0771
 
E-Mail Address
ACA, Aberdeen Proving Ground
(susan.sowa@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT 0004 IS ISSUED TO PROVIDE ANSWERS TO ADDITIONAL QUESTIONS. THE CLOSING DATE OF THE SOLICITATION REMAINS UNCHANGED AT DECEMBER 27, 2007, 2:00 PM EASTERN STANDARD TIME. Quotations must be signed, dated, and received by the closing date and ti me, via fax at 410-306-3726 or email at susan.sowa@us.army.mil at the US Army Contracting Agency, Directorate of Contracting, Attention: SFCA-NR-APC-T, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013. For questions concerning this Request for Quotations contact Susan Sowa Contracting Specialist @ (410) 278-0771 or email susan.sowa@us.army.mil . Please submit your quotations to Ms. Sowa via email to: susan.sowa@us.army.mil or Fax 410-306-3726. Note the following change in the W91ZLK-08-T- 0083 Specifications: 1 each  Sussman 3 kW steam generator based humidity system with a solid state relative humidity transmitter/sensor. Modified to read: 1 each  3 kW electric steam boiler based humidity system with a solid state relative humidity tran smitter/sensor. The boiler must be capable of processing Deionized water. Provide boiler feed water pump as required. QUESTIONS AND ANSWERS ARE AS FOLLOWS CLIN 0001 - QUESTION 13: I see a requirement for intake air and an exhaust blower. Will there be solvent inside the chamber? How much exhaust/intake air is required? The 3kw steam generator that is specified will not be able to produce enough steam to match the humidity rate specified if we are intaking and exhausting very much air. Answer: The air i nside the chamber is 100% recirculated. The air being exhausted is inside the machinery compartment (storage area for water tank, refrigeration, steam generator, etc). We need enough air changes to maintain good operating conditions for the mechanical equi pment in this space. The fresh air intake system that the specs reference is for the dehumidifier. There will be no solvents in the chamber. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (26-DEC-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USA/DABJ/DABJ05/W91ZLK-08-T-0083/listing.html)
 
Place of Performance
Address: ACA, Aberdeen Proving Ground Directorate of Contracting, 4118 Susquehanna Avenue Aberdeen Proving Ground MD
Zip Code: 21005-3013
Country: US
 
Record
SN01476365-F 20071228/071226223910 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.