Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 15, 2007 FBO #2210
MODIFICATION

66 -- Hexapod Environmental Chamber Modification to CSS as posted on 2007DEC06.

Notice Date
12/13/2007
 
Notice Type
Modification
 
NAICS
334516 — Analytical Laboratory Instrument Manufacturing
 
Contracting Office
TACOM - Rock Island, ATTN: AMSTA-AQ-AR, Rock Island Arsenal, Rock Island, IL 61299-7630
 
ZIP Code
61299-7630
 
Solicitation Number
W52H09-08-R-0044
 
Response Due
1/21/2008
 
Archive Date
3/21/2008
 
Point of Contact
Jane E. Nelson, 309-782-5626
 
E-Mail Address
Email your questions to TACOM - Rock Island
(jane.nelson@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Following are techical questions and responses concerning the requirements of subject CSS as posted on 2007DEC06. Question 1: (4)states a chamber interior of 87.5 high and an exterior of 95 high. In (3) you request a moveable chamber that i s 8 off the ground to clear the vibration table. Do you require a chamber with a vertical lift mechanism so that it can be raised and lowered to fit over the vibration table? ANSWER: THAT MAY BE ONE DESIGN OPTION IF THE CONTRACTOR PREFERS TO DO IT THAT WAY, OR IT CAN BE ELEVATED ABOUT 8 INCHES OFF THE FLOOR BY SHORT LAGS TO CLEAR THE TOP OF THE VIBRATION TABLE. Question 2: What sort of equipment will be used to move the chamber as it will weigh several thousand pounds? ANSWER: BY HAND OR WITH A FORK LIFT TO PULL THE CHAMBER, IF THE CONTACTOR WANTS TO INCLUDE MOTORIZED WHEELS FOR CHAMBER MOVEMENT THAT'S FINE. Question 3: (9) cooling rates of 2 degrees F per minute  what is the temperature range that these change rates are req uired? Should the chamber be capable of performing these change rates in an empty chamber or with a specific load inside the chamber? ANSWER: DESIRED IS 1,000 POUND TEST SAMPLE WITH A VOLUME NOT EXCEEDING 50% OF THE CHAMBER INTERIOR, CONTRACTORS NE ED TO SPECIFY WHAT THEIR CAPABILITIES ARE. Question 4: (18) For the flexible floor, what are the dimensions of the shaker top? Who is responsible for connecting the flexible membrane to the table top? Please describe the levels of air pressure cha nges that the chamber and the flexible floor must be rated to handle. ANSWER: TABLE IS APPRPX 5 FOOT BY 5 FOOT, THE GOVERNMENT WILL INSTALL THE MEMBRANE TO THE TABLE, THE CONTRACTOR NEEDS TO CALCULATE THE PRESSURE BUILD-UP BASED ON THE TABLE MOVEME NT AND THEIR CHAMBER AND FLEXIBLE MEMBRANE DESIGN. Date and Time of Pre-proposal Conference and Proposal due remain unchanged.
 
Web Link
AMC
(https://aaisbids.ria.army.mil/)
 
Place of Performance
Address: TACOM - Rock Island ATTN: AMSTA-AQ-AR, Rock Island Arsenal Rock Island IL
Zip Code: 61299-7630
Country: US
 
Record
SN01469585-W 20071215/071213225053 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.