Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 18, 2007 FBO #2060
MODIFICATION

Y -- CONSTRUCT RECREATION COMPLEX GALENA CREEK REGIONAL PARK

Notice Date
7/16/2007
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Office, 1249 S. Vinnell Way, Suite 200, Boise, ID, 83709, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
AG-9360-S-07-0027
 
Response Due
8/19/2007
 
Archive Date
9/3/2007
 
Point of Contact
Steve Roehr, Contracting Officer, Phone 702-839-5575, Fax 702-839-5599, - Charlene Byrd, Procurement Assistant, Phone 702-839-5561,
 
E-Mail Address
sroehr@fs.fed.us, cbyrd@fs.fed.us
 
Description
Project Size Range/Magnitude: $1,000,000 - $5,000,000. Full and Open Competition. Bid/Offer Bond required in the sum of 20% of bid/offer value. Technical/Job Contact: Linda Guy, lguy@fs.fed.us, 775-352-1263 Administrative Contracting Officer: Steve Roehr, sroehr@fs.fed.us, 702-839-5575. Subcontracting Plan required if not a small business. Solicitation/IFB: To be posted at this site on or after 07/18/2007. Due date for sealed bids will be 30 days from the time of posting. Due date will be adjusted on this advertisement at that time. Site Visit/Pre-bid meeting information not yet available. A Pre-bid visit will be scheduled most likely in the 2nd or 3rd week of Solicitation Availability. Potential General Contractors, as well as Subcontractors are encouraged to register here at this FBO website using the Interested Vendors Listing feature. This will form a "Bidders List" of sorts that is available publically on the website. This project consists of constructing a Visitor Center (building) with plaza, aggregate surfaced service road, and paved parking area; constructing a trailhead with picnic sites, tie racks, precast vault toilet, pathways, and parking areas (part aggregate surface course, part paved surface); and constructing a double-lane paved access road off of SR431 (Mount Rose Highway). The work includes the installation of utilities (water, sewer, electrical, telephone, & LPGas) to serve the site and construction of a septic system and drain field. The project also consists of optional work items that may or may not be awarded. These items include: Option 1 ? Constructing a 100 PAOT group sites with site furnishings, a precast vault toilet, pathways, signs, gates, barrier rocks, culvert, water service, and aggregate surfaced loop road and parking. Option 2 ? Constructing a second 100 PAOT group site with site furnishings, a precast vault toilet, pathways, and water service. Option 3 ? Furnishing and installing a pre-fabricated shelter for the 100 PAOT group site. Option 4 ? Constructing the entire water system, except the laterals included in Options 1 and 2. The connections to the existing county-owned water system and the new visitor center shall be part of the base bid. If Option 4 is not awarded, the water system will be constructed by the Forest Service. In this case, the contractor will be responsible for coordinating connections and construction with the Forest Service. Option 5 - Construct and install informational signs and hitch rails. Option 6 - Construct and install a kiosk.
 
Place of Performance
Address: PROJECT LOCATION, about 16 miles South of Reno, Nevada. Access is via US 395 (South) for 9 miles then travel 7 miles West on Mount Rose Highway (SR431). The site address is 18350 Mount Rose Highway, Reno, NV,
Zip Code: 89511-5722
Country: UNITED STATES
 
Record
SN01343069-W 20070718/070716220310 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.