Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 01, 2007 FBO #2043
SOLICITATION NOTICE

A -- AUTOBALANCE MACHINE

Notice Date
6/29/2007
 
Notice Type
Solicitation Notice
 
Contracting Office
N00244 Naval Base 937 North Harbor Drive San Diego, CA
 
ZIP Code
00000
 
Solicitation Number
N0024407T0608
 
Response Due
7/10/2007
 
Archive Date
8/9/2007
 
Description
AUTOBALANCE MACHINE DESC: TWO-PLANE, HARD-BEARING WITH PERMANENT CALIBRATION HORIZONTAL BALANCING MACHINE WITH CAB690 INSTRUMENTATION. Include the following: ? One (1) set of P/N X050854 Twin Roller Carriages with 7mm wide rollers for journal diameters of .30? to 2.0?. ? One (1) Axial Thrust Stop Assembly ? One (1) Axial Thrust Bearing Stand Kit, bed mounted. ? One (1) Safety Hold Down Assembly. ? One (1) Negative Load Bearing Assembly. ? Printer Documentation System consisting of: Printer Support Software; Printer Interface; Printer ? Index Balancing Software package- to compensate for unbalance and eccentricity errors of tooling arbors or end drive adapters. ? Averaging over runs and marking of measured values software used to indicate up to 30 runs simultaneously on the display screen and then perform an averaged value if required. ? Electronic Protractor- to aid in locating the angle of unbalance for correction, this system incorporates an encoder to provide direct indication on instrumentation when the unbalance location on the rotor is manually turned to a predetermined location. ? During Run-Up Measurement Software- to allow the operator to observe and monitor rotor behavior and plot the unbalance reading ? Rotor Specific Calibration Software- for calibrating in one or two planes throughout the entire speed range of the machine, designed specifically for the calibration of hard bearing machines for specific rotor configurations at different speed ranges of the machine. ? Two (2) Protruding Roller Carriages for F18 generator rotors. ? One (1) Bed-Mounted Machine Enclosure per ISO 7475 Class C-600. ? Commissioning of the machine consisting of the following: - Inspect the installation and ensure that the machine is installed properly. - Verify completeness of delivery. - Ensure proper power connection. - Check the machine calibration with a proving. - Recommend compliance with OSHA safety requirements. ? Operator training on the following topics: - Operator Manual - Proper machine setup - Control station operation - Instrumentation setup - Standard and optionally purchased instrumentation software features - Basic preventive maintenance practices
 
Record
SN01331905-W 20070701/070629231725 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.