Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 21, 2007 FBO #1941
MODIFICATION

44 -- CABLE, AIR-DRIER

Notice Date
3/19/2007
 
Notice Type
Modification
 
NAICS
333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, Hill AFB OO-ALC, OO-ALC/PKXD 6038 Aspen Ave (Bldg 1289), Hill AFB, UT, 84056, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA8204-07-R-68051
 
Response Due
4/27/2007
 
Archive Date
8/31/2007
 
Point of Contact
Michelle Mountisne, Phone 801-777-9179, Email michelle.mountisne@hill.af.mil
 
E-Mail Address
Email your questions to Michelle Mountisne
(michelle.mountisne@hill.af.mil)
 
Description
REVISED SYNOPSIS Solicitation Number FA8204-07-R-68051 is changed to delete the requirement for NSN 4440-01-505-6444AH, Cable Air-Drier and is hereby replaced as follows: Description: COTS Item. NSN 4440-01-110-9882AH Cable Air-Drier P/N P-3100STD. The CAD provides the dry air in a prescribed pressure to the Minuteman III missile Hardened Inter-site Cable System (HICS), acting as a monitoring system for cable cuts, leaking splice cases, and unauthorized penetration/tapping. The HICS provides command and control communications network for all missile squadrons and inter-squadron communication. The Cable Air Dryers currently at the Operational Wings are about 30 years old and do not comply with the weapon system specifications and are no longer sustainable. The CAD P/N P-3100STD, NSN 4440-01-110-9882Ah shall be upgraded to allow for remote monitoring with a Communication Module (CM) of the CAD functions; meeting higher electrometric standards; and system safety requirements. Total Line Item Qty: 125 EA. Option I: 190 EA Contractor shall provide two one-week operational and maintenance training periods on the Cable Air Drier and Communication Module. Data requirements include First Article Test Plan, First Article Test Report, Operational and Maintenance Manual, and Commercial Drawings and Associated Lists. Delivery: 1st Article: 240 days after award. Production: 25 per month, 6 months after approval of 1st Article. A technical proposal shall be required of all interested offerors. TO: Full and Open Competition Questions may be directed to Jack V. Albretsen, 526th ICBMSW/PKA, Hill Air Force Base, UT, Telephone (801) 777-5793.
 
Record
SN01254273-W 20070321/070319220740 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.