Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 11, 2006 FBO #1750
SOLICITATION NOTICE

L -- USNS YUKON - CONTROLLABLE PITCH PROPELLER SYSTEM TECHNICAL REP

Notice Date
9/9/2006
 
Notice Type
Solicitation Notice
 
NAICS
332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
 
Contracting Office
Department of the Navy, Military Sealift Command, MSFSC VIRGINIA BEACH 242-2, BUILDING 242-2 CAMP PENDLETON, VIRGINIA BEACH, VA, 23451
 
ZIP Code
23451
 
Solicitation Number
N40442-06-T-5153
 
Archive Date
9/30/2006
 
Description
The Government intends to award a sole source purchase order to Rolls-Royce Naval Marine of Walpole, MA to provide the services of two (2) Rolls-Royce Naval Marine Controllable Reversible Pitch Propeller System (CRPP) Technical Representatives to attend the vessel during an emergency drydocking in Bahrain from September 19-26, 2006. Technical representatives shall provide the following services to the Government: a. Assist and provide technical supervision to the shipyard during removal and reinstallation of all port and starboard propeller blades (eight total). Inspect all blade seal o-rings and wear surfaces. Assist and provide technical supervision during the installation of new GFM o-ring seals. b. Assist the Port Engineer in the inspection of the propeller blade seal ring o-rings. At present oil leakage is present on the port propeller hub blades. Failed blade static or dynamic o-ring seals are suspected. This may be a warranty issue. Determination of the warranty status of this job will be made after the condition of the presently installed o-rings is determined. c. Label all blade seal o-rings and bolt seals with respect to hub, port#, and bolt location and turn over to the Port Engineer. d. In the event that CRPP hubs need to be replaced, provide techinical supervision to the shipyard during removal of existing CRPP hubs, inspection of new hubs prior to installation, and installation of new hubs. e. Upon reassembly of both propeller hubs, confirm that all zero pitch, full ahead pitch and full astern pitch marks match up between blades and hub (port and stbd). Also confirm that no leaks exist during or after this test is accomplished. f. Accompany the vessel on a brief sea trial to observe perfomance of the CRPP system. g. Provide the Port Engineer with a preliminary report prior to departing from the vessel. Provide final report to the Port Engineer within 5 days of work completion. Report is to include a description of all work accomplished, findings, and repair parts utilized.
 
Record
SN01138890-W 20060911/060909220554 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.