MODIFICATION
71 -- Announcement for ARDEC Furniture
- Notice Date
- 7/22/2006
- Notice Type
- Modification
- Contracting Office
- US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
- ZIP Code
- 07806-5000
- Solicitation Number
- W15QKN-06-R-0503
- Response Due
- 8/11/2006
- Archive Date
- 9/10/2006
- Point of Contact
- Patrick Zazzarino, Contract Specialist, (973)724-5522
- E-Mail Address
-
Email your questions to Patrick Zazzarino
(patrick.zazzarino@pica.army.mil)
- Description
- Q: Will bidder be receiving further information regarding sheetrock hard wall office and conference room in Bldg 94? A: Three sheetrock offices (approximately 10??? x 12???): one at each corner, and one to theleft (south side) of the conference room. The existing conference room will change in size to approximately 16??? x 12???. No furniture requirements for sheetrock offices or the conference room. Approximately fourteen (14) Level 3 (approximately 9??? x 12???)offices along the back wall. Q: How did you arrive at hours for labor and design? A: The quantity of hours specified in the RFP are for evaluation purposes. Q: Hours just a guideline for comparison or maximum limit? A: The quantity of hours specified in the RFP are for evaluation purposes only. Q: Drywall placement for new office and conference room, what office level for new dry wall? A: Three sheetrock offices (approximately 10??? x 12???). No furniture requirements. One at each corner, and one to the left (south side) of the conference room. The existing conference room will change in size to approximately (16??? x12???). Approximately fourteen (14) Level 3 offices (approximately 9??? x 12???) along the back wall. Q: Electrical hookup to building A: See Statement of Work. Q: Could you provide everyone with the CAD to work from so offerors do not have to work from scratch? A: Will be posted as an amendment, however, measurements are only proximate and must be verified. Q: Will an amended drawing be available with new drywall office locations? A: No. Measurements are approximate and must be verified. Q: CAD drawing of floor plan via electronically? A: Will be posted as an amendment. Q: File areas or file bank requirements? A: No. Q: If current furniture is blocking metal fuse boxes, can we assume the box is dead? A: No.
- Web Link
-
US ARMY TACOM-Picatinny Procurement Network
(http://procnet.pica.army.mil/dbi/Download/GoGetSolicitation.cfm?SolNum=W15QKN-06-R-0503)
- Record
- SN01095823-W 20060724/060722220227 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |