MODIFICATION
Y -- ELECTRICAL DISTRIBUTION REPLACEMENT, MCRD, PARRIS ISLAND, SC
- Notice Date
- 5/19/2006
- Notice Type
- Modification
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- Department of the Navy, Naval Facilities Engineering Command, Engineering Field Division, South, ROICC Beaufort, P. O. Box 9310, Beaufort, SC, 29904-9310
- ZIP Code
- 29904-9310
- Solicitation Number
- Reference-Number-N62467-06-R-9157
- Response Due
- 6/5/2006
- Archive Date
- 6/20/2006
- Description
- MARKET RESEARCH SPECIAL NOTICE: Proposed contract N62467-06-R-9157, Electrical Distribution Replacement (PI0404M), Marine Corps Recruit Depot, Parris Island, South Carolina, listed herein is being considered for 100% 8(a), HUBZone or SDVOSB Set-Aside. All interested 8(a), HUBZone or SDVOSB concerns will notify this office via email of their intention to submit a proposal on the proposed contract as Prime no later than 5 June 2006. NOTE: 8(a), HUBZone, SDVOSB firms: This notification/submittal MUST include (1) Name, address, and small business size status of the firm; (2) past performance references; evidence of contracts of similar size and complexity, qualifications (construction costs between $1,000,000 and $5,000,000); The project information shall include, at a minimum, the following information: (i) the contract name or number, completion date of the project, and the total cost of the project; (ii) the names and telephone numbers of the facility or installation for whom the work was performed; (iii) the name and telephone number of a supervisory level point of contact at each facility or installation who has knowledge of the performance of the entity or entities. If adequate interest is not received from 8(a), HUBZone or SDVOSB concerns, then the requirement will be issued unrestricted. In addition, if adequate interest is received from 8(a) HUB Zone or SDVOSB concerns, it is the Contracting Officer's determination on how the project will be set-aside in accordance with applicable procedures. The project will remove and replace new power poles, transformers, primary and secondary electrical conductors, and miscellaneous electrical pole line hardware at various sites on the electrical distribution system at Parris Island. Primary areas of work include the Page Field Training area, Elliot?s Beach training area, Golf Course area, and Malecon Drive. The transmission line at Elliot?s Beach and the Golf Course will be changed from 4.16 kV to 12.47 kV to increase efficiency and reliability. Approximately 600 feet of 7.2 kV, single phase primary line will be constructed on Page Field to complete the distribution loop from the Golf Course area to Page Field Training area. The work on Malecon Drive includes the relocation of circuits E, F, and G away from the road. The relocation of the circuits will involve relocation of all existing utility lines currently installed on all affected poles. This project includes the following major work elements: a. Remove and replace approximately 249 medium voltage distribution poles and all associated line hardware. Provide new hardware for other utilities currently mounted on replaced poles and re-install all affected utilities. b. Relocate 12.47kV circuits E and F away from Malecon Drive by re-building overhead line parallel to the existing circuits. These circuits shall be run underground from existing Switchgear #2 to new riser poles. The trees shall be avoided in the re-built circuit route. c. Relocate 12.47kV circuit G underground from existing Switchgear #2 to new riser on opposite side of Malecon Drive near Building 402. Jack and bore method shall be used for conduit run under the roadway. Spare conduits will be installed for future use. d. Replace existing service for Building 864. Replace secondary service entrance for building and reconfigure existing poles. e. Removal and replacement of several transformers in the Malecon Drive area, Page Field training area, Elliot?s Beach training area, and golf course area. f. Provide replacement underground medium voltage three phase service to Argonne Trailer Park Lift Station. The distribution lines and building services shall be constructed in accordance with the contract plans/specifications and the latest version of the National Electric Safety Code (NESC-IEEE C2) and the National Electric Code (NFPA 70). NAICS is 237130: POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION with a size standard of $31 million. All interested 8(a) Set-aside, HUBZone and SDVOSB concerns will notify this office via email at jodeen.cuffe@navy.mil no later than 5 June 2006. YOUR RESPONSE MUST include the requirements (1) through (3) listed herein. TELEPHONE NUMBER IDENTIFIED FOR JoDEEN CUFFE IS CHANGED TO READ 843-228-8563.
- Place of Performance
- Address: MCRD, Parris Island, SC
- Zip Code: 29905
- Zip Code: 29905
- Record
- SN01054103-W 20060521/060519221339 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |