FBO DAILY ISSUE OF JULY 20, 2005 FBO #1332
SOLICITATION NOTICE

F -- Ward WUI Stewardship

Notice Date
7/18/2005
 
Notice Type
Solicitation Notice
 
Contracting Office
BLM NATIONAL BUSINESS CENTER BC663, BLDG 50, DFC, PO BOX 25047 DENVER CO 80225
 
ZIP Code
80225
 
Solicitation Number
NAR050107
 
Response Due
8/18/2005
 
Archive Date
7/18/2006
 
Small Business Set-Aside
Total Small Business
 
Description
The Contract shall be required to furnish all labor, supervision, equipment, supplies, materials, and other incidentals necessary to provide services for fuels reduction and forest health as follows: Thinning, Slashing (approximately 10 acres), Slash Piling (approximately 10 acres), Mechanical Thinning (Approximately 234 acres), Forest Health Improvement/Biomass Utilization, and approximately 1,638 green tons of Biomass. The project area contains approximately 1,000 tons of biomasss consisting of sapling/pole to mature size pinyon and juniper trees. Note: All merchantable material to be removed will be purchased from the Government and paid for at the total offer values shown in Line Item 0001 A through. 0001 C. through either application of Conservation Credits earned or cash deposit. The Contractor shall develop and submit a Treatment Plan and Schedule to accomplish the project objectives, and organize and direct all of the equipment and personnel needed to fully accomplish the work. The contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to complete the work required. The Treatment Plan and Schedule will be agreed upon by both parties and incorporated into the contract. All changes to the Treatment Plan will be agreed to prior to the changes taking effect. The Treatment Plan and Schedule shall include as a minimum the following items: product removal - felling, limbing and piling of merchantable materials and biomass material, slashing and piling operations, hauling operations (if applicable), equipment involved; Road Maintenance - It is not anticipated that road maintenance will be an issue, however, contractor shall consider this circumstance and shall indicate blading specifications, locations of possible temporary roads, construction specifications, equipment involved; Fire Prevention Plan - prevention and control of fires, detailed list of personnel and equipment; Slash Plan - equipment and techniques used to meet slash specifications; and Schedule for completion of objectives. Project Location and Description: Location: The project is located approximately 2 miles south of the town of Ely, Nevada in Township 16 North, Range 63 East, Sections 20 and 28 See Project map. Access. The project acrea is largely accessible by either two-track road or paved road (highway 6). Some cross country travel is required to access every part of the work area
 
Web Link
Please click here to view more details.
(http://ideasec.nbc.gov/j2ee/announcementdetail.jsp?serverId=LM142201&objId=948330)
 
Place of Performance
Address: The project is located approximately 2 miles south of the town of Ely, Nevada in Township 16 North, Range 63 East, Sections 20 and 28.
Zip Code: 893019408
Country: USA
 
Record
SN00849404-W 20050720/050718212150 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.