MODIFICATION
A -- Advanced Silicon Switch Development
- Notice Date
- 1/11/2005
- Notice Type
- Modification
- Contracting Office
- US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
- ZIP Code
- 07806-5000
- Solicitation Number
- W15QKN-05-R-0516
- Response Due
- 2/28/2005
- Archive Date
- 3/12/2005
- Description
- The purpose of this amendment is to change the response date from 10 February 2005 to 28 February 2005 and to state that the government anticipates awarding a basic two year effort contract for the design, fabrication, test and evaluation of a novel, optically controlled advanced silicon switch for high energy pulsed duty applications under the Electromagnetic (EM) Gun Program with two option efforts. Option 1 Effort - Scale up processes to fabricate 150mm diameter hybrid device assemblies with integral optical control, and demonstrate critical switch performance through electrical characterization tests. Option 2 Effort - Design a prototype load switch, fabricate 150mm scale devices, assemble the load converter and conduct evaluation tests to demonstrate performance with a high fidelity pulsed alternator power supply.
- Web Link
-
US ARMY TACOM-Picatinny Procurement Network
(http://procnet.pica.army.mil/dbi/Download/GoGetSolicitation.cfm?SolNum=W15QKN-05-R-0516)
- Record
- SN00733051-W 20050113/050111211851 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |