Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 12, 2004 FBO #1021
MODIFICATION

N -- Install Chilled Water Pumps

Notice Date
9/10/2004
 
Notice Type
Modification
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Combat Command, 55 CONS, 101 Washington Sq Bldg 40, Offutt AFB, NE, 68113-2107
 
ZIP Code
68113-2107
 
Solicitation Number
FA4600-04-T-0186
 
Response Due
9/16/2004
 
Archive Date
10/1/2004
 
Point of Contact
Tiffany Breske, Contract Specialist, Phone 402-232-5992, Fax 402-294-0430, - Thomas Williams, Contracting Officer, Phone 402-232-5993, Fax 402-294-0430,
 
E-Mail Address
tiffany.breske@offutt.af.mil, thomas.williams@offutt.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
Questions and Answers: Q. Are valves to be understood as shutoff valves,flow control valves, check valves,as well as strainers, or are there suction disfussers, multipurpose valves already existing and planned to be reused? A. The valves are to be reused Q.Also would like to know if the size of these valves are known, what would be desired as to the material and the specifics of the valves. A. Valve sizes are as follows Loop A INLET10" X 10"OUTLET, LOOP B INLET12"X12"OUTLET, LOOP C INLET12" X 12"OUTLET Q.Would there be any flex connectors or some type of spring hangers required to protect piping on start ?up of pump? A. There are flex joints on both sides of all six pumps that will need to be replaced Q.Could you note the horsepower of these pumps,weight,size,etc. replacement pumps info A.Loop(A) aurora 8x8x11model 411-bf loop (b) aurora 8x8x11b model 411-bf. Loop (c) Aurora 8x10x15b model 411bf Q.Do these pumps match up on the same centers of the existing piping or will the centers and elevations require new configuration of piping be an issue. A. No they do not line up there will be appox.1"- 6" difference Q.Also will fresh air machines be required while welding is being done. A This would be covered under osha regs or standard work practice . Q. Request specific data on pumps: model make size,weight,gpm,manufactor requirements as shaft aligment etc. replacement pumps info . A. Loop(A) aurora 8x8x11model 411-bf loop (b) aurora 8x8x11b model 411-bf. Loop (c) Aurora 8x10x15b model 411bf Q. Are pumps to be removed from base by contractor. A. YES Q. Will loss of water be at a mininum and will contractor bear the responsibility of the addition of treated water. A. YES
 
Place of Performance
Address: Offutt AFB, NE
Zip Code: 68113
Country: USA
 
Record
SN00669812-W 20040912/040910211953 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.