Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 10, 2004 FBO #1019
MODIFICATION

Z -- Building Renovation - IRAQ Communications & Media Commission

Notice Date
9/8/2004
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, Project and Contracting Office, Project and Contracting Office, Iraq, Republican Presidential Compound APO, Baghdad, Iraq, AE, 09335
 
ZIP Code
09335
 
Solicitation Number
W914NS-04-Q-0219
 
Response Due
9/21/2004
 
Archive Date
10/6/2004
 
Point of Contact
Walter Walter, Contract Specialist, Phone 703-343-9218, - Richard Nalwasky, Contracting Officer, Phone 703-343-9218,
 
E-Mail Address
walter.walter@cpa-iq.org, richard.nalwasky@cpa-iq.org
 
Description
THE PURPOSE OF THIS AMENDMENT, AMENDMENT TWO, TO W914NS-04-Q-0219 IS TO CLARIFY THE TECHNICAL SPECIFICATIONS OF THIS REQUIREMENT AND TO EXTEND THE DUE DATE OF THE QUOTE. 1. The refurbishment of the ICMC Bulging is a design / build effort. All pre-existing plans were destroyed. There is no adjacent land for additions to be built onto the existing structure. The minimum standard for construction will be based on the 2000 edition of the International Building Code and related references. All necessary permits have been obtained. All drawings shall be accomplished using ECAD. Purchase and installation of IT equipment and furniture is outside the scope of this contract. 2. The Quote will contain the following deliverables: a. Statement of Work (SOW) As a minimum the SOW will address the technical approach to be employed to satisfy all the requirements of this effort and include plans for the HVAC, electrical, fire alarm / suppression, and glazing requirements envisioned for the refurbishment. b. Program schedule c. Concept design d. Full set of drawings to include as built drawings, shop drawings, and floor plans before and after the refurbishment. The post refurbishment floor plan shall include office partitions. e. Full set of design specifications to include technical, workmanship, and material specifications. 3. The quote should include one generator; 400 volt, 750KVa, 3 phase, 50 Hz. 4. The total budget for this effort is $4 million plus or minus 10 percent. 5. The new due date for the quote is 1700 hours on 21 September 2004. The point-of-contact is Charles T. Clements, charles.clements@cpa-iq.org, (703) 343-9218.
 
Place of Performance
Address: Baghdad
Zip Code: 09316
Country: Iraq
 
Record
SN00667880-W 20040910/040908212409 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.