Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 04, 2004 FBO #1013
MODIFICATION

R -- Definitional Mission to Evalute Petrochemical and Energy Projects in China

Notice Date
9/2/2004
 
Notice Type
Modification
 
NAICS
541611 — Administrative Management and General Management Consulting Services
 
Contracting Office
United States Trade and Development Agency, TDA Contracts Office, USTDA, 1000 Wilson Boulevard, Suite 1600, Arlington, VA, 22209-3901
 
ZIP Code
22209-3901
 
Solicitation Number
USTDA-04-Q-3-264
 
Response Due
9/15/2004
 
Archive Date
9/30/2004
 
Point of Contact
Anthony Grayson, Contracts Manager, Phone 703-875-4357, Fax 703-875-4009,
 
E-Mail Address
contract@tda.gov
 
Small Business Set-Aside
Total Small Business
 
Description
SCOPE OF WORK “DEFINITIONAL MISSION” FOR ADVISORY AND ASSISTANCE SERVICES BY NON-GOVERNMENTAL SOURCES FOR CHINA CHINA: PETROCHEMICAL AND ENERGY DEFINITIONAL MISSION 1 SCOPE OF WORK The U.S. Trade and Development Agency (“USTDA”) requires services under this non-personal services Contract to support or improve its decision-making relative to the funding of projects and activities in developing and middle income countries. The Contractor shall provide a report to USTDA, which will: 1.2 assess and justify whether or not USTDA should provide funding for the proposed feasibility study or other activities; 1.3 assess any alternative study or activities which the Contractor sees as viable options for USTDA consideration; and 1.4 provide supporting analysis and recommendations on the above information in a final report that analyzes all the relevant issues. 2 DELIVERY & PERFORMANCE REQUIREMENTS 2.1 KICK-OFF MEETING WITH THE USTDA PROGRAM OFFICE Upon award, the Contractor shall contact USTDA’s Contracting Officer’s Technical Representative to schedule a meeting to discuss details of the Contract assignment. Unless otherwise advised by the COTR, this meeting will be held at USTDA’s office in Arlington, Virginia. The COTR shall provide the Contractor with names and addresses of the project sponsor(s), other pertinent entities to contact in the United States and overseas, and any other relevant details that may impact upon the design and/or evaluation of the proposed project(s). 2.2 PRE-VISIT REPORT Prior to departure to the host country, the Contractor shall provide the COTR a pre-visit written report of 3-5 pages containing the proposed schedule or itinerary, preliminary strategies or findings on project viability, financing options, U.S. company interest in the project, a list of contacts to be made during the visit and a pre-visit checklist of issues, information and questions to be utilized during the visit. 2.3 USTDA RESPONSIBILITY USTDA will advise the U.S. Embassy in the host country of the Contractor’s proposed travel itinerary prior to departure and request that the Commercial Section of the Embassy provide the Contractor with names and addresses of appropriate host country officials with whom to meet. 2.4 CONTRACTOR’S HOST COUNTRY TRAVEL The Contractor shall travel to the host country to meet with relevant project officials and with the U.S. Embassy. The Contractor shall contact the Commercial Section at the U.S. Embassy upon arrival and prior to departure for briefing and debriefing meetings. While the Embassy may be able to assist the Contractor in arranging some initial meetings with host country officials, the Contractor is responsible for arranging the meetings as well as logistics for the visit, i.e., hotel accommodations, transportation, and interpretation services. In some cases, the Contractor may need to Contract with a local entity to assist with these logistics. Local entities may not provide the technical work of substance for the creation of the DM report. 2.5 CONTRACTOR MEANINGFUL DISCUSSIONS The Contractor shall hold meaningful discussions with appropriate contacts to determine and gauge the interest of potential project financiers and potential U.S. suppliers and assess whether the proposed project(s) is economically, financially, and technically viable. The Contractor shall analyze the potential procurement of U.S. goods and services for project implementation by categories and dollar values. The analysis shall include an assessment of the project risks and its financial viability, the priority of the project and political/social/organizational support it has, potential sources of financing, and the capability and experience of the project sponsor. The analysis shall also include an assessment of the social and economic development impacts of the proposed project. 2.6 USTDA REPORT OBJECTIVES If the Contractor recommends that USTDA fund the study (ies) in a phased approach, and/or if any outstanding issues should be resolved or conditions met before funding is approved, those phases, issues and/or conditions should be clearly explained in the recommendation. 2.6.2 The Contractor shall provide a final report to the USTDA, which will: 2.6.2.1 assess and justify whether or not USTDA should provide funding for a feasibility study of the proposed project(s); 2.6.2.2 assess any alternative or other activities which the Contractor sees as viable options for USTDA consideration; and 2.6.2.3 provide recommendations on the above information in a final report that analyzes all relevant issues 2.6.3 Contractor recommendations shall be based upon USTDA funding criteria, which are that the project must: 2.6.3.1 be likely to receive implementation financing, and in addition, have a procurement process that provides “equal access” to U.S. firms; 2.6.3.2 represent an opportunity for sales of U.S. goods and services that is many times greater than the initial investment of USTDA assistance; 2.6.3.3 be a development priority of the project sponsor and country where the project is located and have the endorsement of the U.S. Embassy in that nation; and 2.6.3.4 involve U.S. companies that are facing strong competition from foreign companies receiving subsidies and other support from their governments. 3 DEFINITIONAL MISSION FINAL REPORT 3.1 EXECUTIVE SUMMARY (1-2 PAGES) The Contractor shall submit an executive summary of the report’s findings and recommendations. 3.2 PROJECT DESCRIPTION (3-5 PAGES) The Contractor shall submit a description and history of the project, including, among other things, host country and/or other project sponsors, sector, project location, source of raw materials, infrastructure requirements, proposed technological approach, legal and regulatory framework (licenses, permits, etc.), implementation schedule, economic fundamentals (estimated capital cost, operating costs, expected revenues, etc), and any other key variables or issues that the Contractor deems critical as part of a thorough activity/project evaluation. 3.3 DEVELOPMENTAL IMPACT (2-3 PAGES) The Contractor shall submit an assessment of the development impact of the project on the host country. In this section, the Contractor shall discuss two aspects of “developmental impact”. 3.3.1 Primary Developmental Benefits - The Contractor will discuss the most important benefits that the project will provide to the host country. Items of interest to USTDA include, but are not restricted, to the following: number of new jobs created by the project; technology transfers; and new service etc. 3.3.2 Alternatives – Are there competing ways to achieve host country objectives? At the Definitional Mission stage, it will not be possible to address these questions definitively, but the Contractor, at a minimum, is expected to define and comment on the broad alternatives available to the host country project sponsor. 3.4 PROJECT SPONSOR’S COMMITMENT (1-2 PAGES) The Contractor shall submit a description of the host country project sponsor(s) business/government operations or authority and an assessment of the project sponsor’s ability to implement the project. 3.5 IMPLEMENTATION FINANCING (2-4 PAGES) The Contractor shall submit a review of the financing options for project implementation, including an assessment of the overall cost estimate of the project and, for projects involving potential U.S. equity investment, the project’s proposed debt-equity structure to ensure that it corresponds to the requirements of the prospective lenders (this aspect is critical to USTDA’s decision making). As part of this review, the Contractor is required to contact officials from the potential financing institutions, including, where appropriate, multilateral lending institutions, Ex-Im Bank, OPIC, and private/commercial sources, to assure that the project sponsors have adequately explored their financing options. The Contractor shall provide names and phone numbers of contacts at the potential lending institutions and summarize their comments. The Contractor must determine the most likely source(s) of implementation financing and ensure that the terms of reference for any proposed feasibility study fulfill the requirements of the most likely source(s). 3.6 U.S. EXPORT POTENTIAL (1-2 PAGES) The Contractor shall submit a best estimate of potential procurement of U.S. goods and services for project implementation. This estimate should be supported by a breakdown by category and dollar value of goods and services likely to be imported for the project and an illustrative list of potential U.S. suppliers of the goods and services for those goods and services listed as likely U.S. exports. A report of discussions with a reasonable number of U.S. companies that could be exporters, and their level of interest in the project, should also be included. 3.7 FOREIGN COMPETITION (1-2 PAGES) The Contractor shall discuss the foreign competition for goods and services likely to be procured for project implementation by category, including a discussion of U.S. industry competitiveness in each category, taking into account geographic factors, local industry capabilities, technology and licensee issues, past procurement tendencies of the project sponsor, and how the procurement is likely to be conducted. 3.8 IMPACT ON THE ENVIRONMENT (1-2 PAGES) The Contractor shall submit a statement regarding the likely consequences the proposed project may have on the environment and ensure that the terms of reference for the feasibility study include, at a minimum, a preliminary review of the project’s impact on the environment, with reference to local environmental requirements and those areas requiring evaluation by the potential lending agencies. The feasibility study should identify potential negative impacts and discuss the extent to which they can be minimized. 3.9 IMPACT ON U.S. LABOR (1-2 PAGES) The Contractor shall submit an assessment of the impact of the project on U.S. labor. 3.10 QUALIFICATIONS (1-2 PAGES) The Contractor shall submit the feasibility team qualifications required to conduct the study and the evaluation criteria to be used by the Project Sponsor in cases of completed studies. 3.11 JUSTIFICATION (1-2 PAGES) The Contractor shall provide an explanation of why USTDA’s grant funding is needed. 3.12 TERMS OF REFERENCE (1-5 PAGES) The Contractor shall provide Terms of Reference (TOR) for the feasibility study. The TOR which must be endorsed by the Project Sponsor, shall include, at a minimum, the following: 3.12.1 Purpose and objective of the study and; a technical analysis of the project; 3.12.2 An economic analysis of the project (This section will usually include attention to competing alternative methods of achieving the same or similar host country objectives); 3.12.3 A financial analysis of the project; 3.12.4 An appropriate environmental analysis of the project; 3.12.5 A review of regulatory issues related to the project; 3.12.6 A summary of key host country economic development benefits expected from projects (e.g., job creation, new technologies introduced, productivity enhancements, new production/transport/communications capacities that will result from the project). 3.12.7 A list of proposed equipment and services for project implementation, including a list of potential U.S. sources of supply (company names and contact information); 3.12.8 An implementation plan (anticipated next steps necessary to implement the project); and 3.12.9 A Final Report that summarizes the findings of the study and/or other appropriate deliverables. The TOR must be designed to meet the requirements of the most likely source(s) of implementation financing. The requirements of some of the potential financing sources may be found at the following web sites: www.opic.govfinance/home.htm www.exim.gov/tools/index.html www.ifc.org/proserv/ www.adb.org/privatesector/finance/default.asp www.ebrd.com/apply/index.html www.iadb.org/iic/english/pdf.htm www.afdb.org/opportunities/business_general_proc_notices_country.htm 3.13 FEASIBILITY STUDY BUDGET (2-3 PAGES) The Contractor shall provide a budget a detailed budget and task breakdown for the feasibility study prepared in accordance with the Feasibility Study Budget Format and Budgeted Labor Requirements, which can be found at www.tda.gov. The budget should be supported with sufficient detail to enable USTDA staff or others reviewing the material to understand completely, not only the budgeted amounts, but also the methodology that justifies the budget amounts. The budget should include: 1. Labor, budgeted by position title and task for each of the positions on the feasibility study team. Positions should be identifiable, with descriptions of the positions and proposed team members included in the proposal. Person-Days should reflect the proposed number of days of work effort proposed for each position for each task. The unit cost should be the actual loaded daily rate for each position. The proposed budget may not include fee or profit. 2. Itemization should be prepared for per diem, transportation, communications, subcontracts, translation of Final Report, and other direct costs. Per Diem must be based on U.S. Government rates, which are available on the State Department web site (http://www.state.gov/www/perdiems/index.html). The budget should support the feasibility study terms of reference. 3.14 RECOMMENDATIONS (1-2 PAGES) The Contractor shall provide recommendations as to: 3.14.1 whether or not the project meets USTDA’s basic funding criteria; 3.14.2 the appropriate TOR for the proposed study; and 3.14.3 the appropriate budget for the proposed study. 3.15 CONTACTS The Contractor shall submit a list of individuals contacted during the DM, with their addresses, phone and fax numbers, and e-mail addresses. 4 CONTRACTOR INTERIM STATUS REPORTING AND DELIVERABLES The Contractor shall provide verbal updates to the COTR when necessary. The deliverables may also take the form of information, advice, opinions, alternatives, analyses, evaluations, recommendations, interim and final reports, or other oral or written work products needed for successful performance. 5 CONTRACTOR -- DEFINITIONAL MISSION REPORTS The Contractor shall prepare a report to USTDA that addresses all the issues in the Definitional Mission requirements as outlined in Section 3.1 through 3.15. Since this report will be available for public distribution, any sensitive or business proprietary information shall be included in a separate confidential attachment to the report. 5.1 REPORT DRAFT -- COTR APPROVAL The Contractor shall provide the report in draft form to USTDA for COTR review within ten (10) working days after completion of the overseas visit. The report should be clearly marked “Draft” on the cover. 5.2 REVISED REPORT DRAFT – COTR APPROVAL Within five (5) working days after receiving the COTR’s comments on the draft report, the Contractor shall submit a revised copy for COTR review. The Contractor shall revise the report as necessary until securing final COTR approval. 5.3 FINAL REPORT – COTR APPROVAL The final report shall incorporate all mutually agreed upon material and revisions. The report shall include any supporting documentation. It shall be grammatically and factually correct in all respects, internally consistent, and all statements and tables shall be clear and easily understood by a competent reader, and contain no typographical errors. Upon notification from the COTR that the report is considered acceptable, the Contractor shall submit twenty (20) copies, and one (1) unbound original to USTDA. All reports must be paginated and submitted in Microsoft Word on a 3.5-inch disk or on a CD-Rom. The Contractor shall also submit the report to the COTR as an e-mail attachment, and also in Microsoft Word format. 6 PROJECT DESCRIPTIONS AND PROFILE During Country Manager Hardy’s July 2004 business development trip to China, he had the opportunity to meet with the Chairman of the China Petroleum and Chemical Industry Association about potential support for a number of development petrochemical/energy projects that range from coal bed methane extraction and power production to coal liquefaction and oxidation. During that meeting, the Chairman committed to identifying specific projects, hosting the DM consultant and providing a team of experts to accompany the consultant into the field. As background, China's chemical industry includes chemical extraction, and production of fertilizers, pesticides, basic inorganic raw materials, and basic organic raw materials among others. China is a world leader in the output of more than 10 varieties of chemicals, such as synthetic ammonia, chemical fertilizers, sulphuric acid, and soda ash. Significantly, Shanghai, Beijing, Tianjin, Dalian and Shenyang are China's most important chemical industry bases with China exporting such products to more than 100 countries and regions. Further, China's energy industry, including thermal, hydro and nuclear power, has developed rapidly over the past 15 years. In the 1990s, China's installed capacity increased from 100 million kw to 200 million kw, and its generated energy and installed capacity both ranked second in the world. This type of expansion provides a number of opportunities for U.S. companies to engage China in the development of future projects. China has placed a high priority on developing its electric power sector ever since the unification of the country in 1949. Planners in China recognized early on that the country needed to industrialize to support its huge population, and that the availability of reliable electric power was essential for building an industrial base. In 1949, China had only 1850 MW of generating capacity. By 1980, the installed capacity had increased to 65,870 MW, and China was becoming an important source of industrial goods on world markets. The policies of the past 20 years have resulted in the expansion of its generating capacity to 318,640 MW, making China the second largest power producer in the world. It has also resulted in numerous technical advances, including the introduction of nuclear power, fluidized bed combustion, super critical pressure thermal plants, and high-efficiency emissions control systems. Recently, China has focused on reforming the structure of its power industry to improve economic efficiency and make it more responsive to the needs of its consumers. As a result, the Chinese market for new power generation equipment is now the second largest in the world, trailing only the United States. If current trends continue, it will exceed the U.S. market before the end of this decade. This increasing need for plant components will largely be met by China’s rapidly expanding power equipment industry. However, there will also be significant opportunities for U.S. exporters to supply equipment in China. The areas of opportunity will be predominately in very large coal fired plants, gas turbines, and projects involving newly developed technologies, such as integrated gasification combined cycle and coal bed methane production. However, the principal issue in the energy and petrochemical sectors is access. This includes: - Access to major investment opportunities, such as integrated upstream development, natural gas transmission facilities, liquefied natural gas (LNG) import facilities, power plants, refineries, and petrochemical plants. - Access to markets and end-use customers in refining and marketing sectors and petrochemicals. - Access to data for better risk evaluation. Increased access would help develop the Chinese economy through the application of advanced technology and management practices, increase foreign investment, and increase employment opportunities for Chinese citizens. Along with policies limiting access, many of the difficulties within this sector are commercial and legal. They include issues such as transparency, protection of intellectual property, dispute resolution, and rule of law. As a result, the Definitional Mission consultant will pay particular attention to areas where U.S. firms are best positioned to compete in the Chinese market for the sale of goods and services in the energy/petrochemical sectors. China Petroleum and Chemical Industry Association The CPCIA is a newly established trade association that is responsible for strengthening the exchange between government and enterprise and developing international cooperation to promote technological advancement within the industry. The goals of the CPCIA can best be summarized as: strengthen industrial regulations; develop proposals for changes to economic policy and legislation to support enterprise; participate in industrial planning, including the pre-feasibility of major projects; and participate in market construction. The CPCIA currently represents 265 members companies within China. NOTE: THIS NOTICE WAS NOT POSTED TO WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (02-SEP-2004); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/TDA/TDACO/TDACO/USTDA-04-Q-3-264/listing.html)
 
Place of Performance
Address: Arlington, VA; contractor's location; and designated host country.
 
Record
SN00664992-F 20040904/040902213954 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.