SOLICITATION NOTICE

Y -- Y - Highway Construction - WA PFH 158-1(5), FLOWERY TRAIL ROAD

Notice Date
7/26/2004
 
Notice Type
Solicitation Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, WA, 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
DTFH70-04-B-00015
 
Response Due
10/5/2004
 
Point of Contact
Contracts Office, Western Federal Lands Highway Division, Phone (360)619-7520, Fax (360)619-7932,
 
E-Mail Address
contracts@mail.wfl.fhwa.dot.gov
 
Description
WA PFH 158-1(5), FLOWERY TRAIL ROAD, Colville National Forest, Stevens County, Washington. THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS. THIS WORK CONSISTS OF: 7.975 km of grading, drainage, base, asphalt concrete pavement, and new signing and striping. THE PROJECT INCLUDES construction survey & staking; contractor sampling & testing; construction schedules; monuments & markers; water system, irrigation service valve, and drain sump relocate; Erosion Control devices: 4,500 m silt fence; 250 m brush barriers; 100 ea straw bales; 100 su soil stabilization; 15,000 m3 watering for dust control; 25.276 ha (CQ) clearing and grubbing; Removal of 45 ea sign/markers; removal of 5 ea gates; removal of 2,700 m of fence; removal of 6,650m temporary erosion control measures; Excavation & Embankment: 312,000 m3 excavation; 5,000 m3 of subexcavation; 6,500 m3 select borrow; 21,367 m3 select topping; 5 ea boulders; 11,710 m2 (CQ) roadway obliteration; 7,450 m3 placed riprap, class 2, rock armor: 7,000 m riprap lined ditch, type 1; 500 m riprap lined ditch, type 2; 1 ea culvert outlet control system; 140.0 m2 energy dissipater; 396.0 m2 MSE retaining walls; 2,400 t aggregate base grading D; 4,000 t aggregate surface course; 22,000 t emulsified asphalt treated aggregate base, grading D; 215 t emulsified asphalt grade CSS-1; 17,600 t hot asphalt concrete pavement; 1,035 t asphalt cement grade SHRP PG 58-34; 175.0 t mineral filler(hydrated lime); 5 t minor hot asphalt concrete; 30.0 t asphalt tack coat; 20 m3 minor concrete structures; Culverts & Drains: 650.0 m 450 mm pipe culvert; 800.0 m of 600 mm pipe culvert; 145.0 m 900 mm pipe culvert; 23.4 m of 24000 mm span, 2400 mm rise precast rbc; 2 ea end section for precast rbc; 4 ea of 1200 mm sanitary sewer manhole; 200 m of 200 mm collector pipe; 50 m of 200 mm outlet pipe; 1.0 m2 paved waterway type V, curb outlet; 90.0 m of Portland cement concrete curb, 75 mm depth; 30 m of Portland cement concrete curb and gutter, 300 mm depth; 1m of 100 mm PVC waterline; 441m of 200 mm PVC waterline; 5m of 150 mm ductile iron waterline; 3 ea fire hydrant assembly; 4 ea 200 mm gate valves; 2 each water meters; 92m of 25 mm HDPE service pipe; 17m of 50 mm HDPE service pipe; Sewer Systems: 19 m of 150 mm PVC pipe; 60m of 200 mm PVC pipe; 270m of 250 mm PVC pipe; 2,150.0m guardrail system G4, type I, class A (wood posts); 100.00 guardrail system CRT, type I, class A; 5 ea terminal section type CRT; 17 ea terminal section type flared; 2,800m fence, wire, type 2; 2 ea gate, type 2, 3.6 m width; 4 ea gate, type 2, 5.5m width; 14,500 ha topsoil; 170.00 su turf establishment; 7,500 m2 turf establishment; 30.00 m2 sign installation; 280 ea delineators, type CC-3; 50 ea delineators, type CC-4, 130 ea delineators, type DD-3, 10 ea removing and resetting signs; 5,500 m pavement markings type B, broken yellow; 24,950 m pavement markings, solid yellow; 31,950 m pavement markings, type B, solid white; Temporary Traffic Control: 40 ea temporary traffic control; 15 ea traffic control (flaggers & pilot cars); 300 ea barricade type 1; 120.00 m2 barricade type III (2.4 meter); 115.00 m2 cone type 1050mm tubular; 50 ea construction signs, 1000 ea construction signs(Government furnished); 15,500 m drum type I meter; 100 ea moving temporary concrete barrier (Government furnished); 200 day temporary pavement markings. 9,000 flagger hours; 3,200 pilot car hours; 60 m3 streambed material; and other smaller items of work. PROJECT IS LOCATED approximately 1 km east of Chewelah, Washington. Work shall be completed by August 22, 2006. Estimated PRICE RANGE is between $5,000,000 and $10,000,000. When solicitation documents are issued, the Invitation For Bid (SPECIFICATIONS) AND BIDDER?S PACKET will be available in electronic format only at www.wfl.fhwa.dot.gov/edi/. Pending finalization of details to make plans available electronically, plans will only be available in paper format. REQUEST PLANS by E-Mail to contracts@mail.wfl.fhwa.dot.gov, or by fax to (360)619-7932. The following applies only to Minority, Women-Owned and Disadvantaged Business Enterprises (DBEs): The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. The DOT Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT?s Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at prime rate, as published daily in the Wall Street Journal, plus 1.75 percent. For further information about the Bonding Assistance Program, call (800) 532-1169. Internet address: http://osdbuweb.dot.gov.
 
Place of Performance
Address: The project is located approximately 1 km east of Chewelah, Washington
 
Record
SN00630352-W 20040728/040726211914 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.