Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 21, 2004 FBO #0968
SOLICITATION NOTICE

Y -- Town Creek Watershed, Dam No. 59

Notice Date
7/19/2004
 
Notice Type
Solicitation Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Natural Resources Conservation Service, Mississippi State Office, Federal Building, Suite 1321 100 West Capitol Street, Jackson, MS, 39269
 
ZIP Code
39269
 
Solicitation Number
NRCS-13-MS-04
 
Response Due
9/8/2004
 
Point of Contact
Verlene Ratliff, Contract Specialist, Phone 601-965-4098, Fax 601-965-5178, - Faith Miller, Contract Specialist, Phone 601-965-4981, Fax 601-965-5178,
 
E-Mail Address
vmr@ms.nrcs.usda.gov, fmiller@ms.nrcs.usda.gov
 
Description
The work consists of construction of floodwater retarding structure No. 59. The major items of work are: Clearing, Class B, Sediment (Permanent) Pool & Site Area-1 lump sum; Clearing & Grubbing, Embankment Base Area-1 lump sum; Structure Removal-1 lump sum; Silt Fence-1,200 L.F.; Erosion Control Mat-185 S.Y.; Protective Cover-5.9 acres; Traffic Control-1 lump sum; Removal of Water-1 lump sum; Excavation, Common-30,900 C.Y.; Earthfill, Class A, Dam-39,500 C.Y.; Earthfill, Class C, By-pass Road-10,000 C.Y.; Earthfill, Class C, Group B Material-1,850 C.Y.; Drainfill-665 C.Y.; Topsoil-6,000 S.Y.; Reinforced Concrete, Class 4000-491.4 C.Y.; Steel Reinforcement-84,000 Lb.; 6? Dia. PVC Pipe, Perforated-260 L.F.; 6? Dia. PVC Pipe, Non-perforated-172 L.F.; 4? Dia. PVC Pipe-1 lump sum; Rock Riprap-1,830 Tons; Filter Material for Rock Riprap-54 C.Y.; Water Control Slide Gates, 36?x36? Upward Opening-1 lump sum; Water Control Flap Gates, 8? Dia.-1 lump sum; Low Stage Trash Rack-1 lump sum; High Stage Trash Rack-1 lump sum; Cast Iron Manhole & Cover-1 lump sum; Guard Rail-1 lump sum; Corrugated Metal Pipe-1 lump sum; Chain Link Fence-1 lump sum; Quality Control-1 lump sum; Geotextile-2,500 S.Y.; Field Office-1 lump sum; Double Bituminous Surface Treatment-1,652 S.Y.; Mobilization & Demobilization-1 lump sum. This work is to be completed within 410 calendar days. Estimated price range for this work is $1,000,000 to $5,000,000. All responsible sources may submit a bid, which shall be considered by the agency. The solicitation documents will be available on the FedBizOpps website on or about August 9, 2004.
 
Place of Performance
Address: Lee County, Mississippi
 
Record
SN00625985-W 20040721/040719211650 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.