Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 26, 2004 FBO #0851
SOLICITATION NOTICE

95 -- Closure Protective Covers

Notice Date
3/24/2004
 
Notice Type
Solicitation Notice
 
NAICS
332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
 
Contracting Office
Department of the Navy, Naval Sea Systems Command, NUWC Division Newport, Simonpietri Drive, Newport, RI, 02841-1708
 
ZIP Code
02841-1708
 
Solicitation Number
N66604-04-R-2857
 
Response Due
4/23/2004
 
Archive Date
5/8/2004
 
Point of Contact
Jeanne Whiteman, Contract Negotiator, Phone 401-832-1927, Fax 401-832-4820, - Maria Goulart, Contract Negotiator, Phone 401-832-6379, Fax 401-832-4820,
 
E-Mail Address
whitemanjy@npt.nuwc.navy.mil, goulartmf@npt.nuwc.navy.mil
 
Small Business Set-Aside
Total Small Business
 
Description
?This synopsis is being posted to both the Federal Business Opportunities(FBO) page located at http://www.eps.gov and the Navy Electronic Commerce on Line(NECO) site located at http://www.neco.navy.mil. While it is understood that FBO is the single point of entry for posting of synopsis and solicitations to the internet, NECO is the alternative in case FBO is unavailable. Please feel free to use either site to access information posted by the Navy Sea Systems Command.? Our department no longer issues solicitations or amendments in paper form. Instead, they may be accessed at our web site http://www.npt.nuwc.navy.mil/contract/. We also provide electronic access in our Bid Room. The Naval Undersea Warfare Center, Newport has a requirement for the following Closure Protective Covers, which are used to protect the TOMAHAWK Capsule Launching System (CLS) Capsule Closure Assembly during handling, shipping, and storage. Quantities are 1 ea. First Article Testing item and 44 ea. Production items. All items shall be manufactured to NUWC Drawing # JCM-14865. The First Article Test can be waived if the firm has successfully manufactured the item previously. The contractor shall be responsible for conducting the First Article Test/Inspection. The Test/Inspection shall be at the contractor?s plant. The FAT item shall be available within 90 days of contract award. It is estimated that the FAT will take a maximum of 8 days. The first article will not be destroyed in testing and shall be considered part of the contract quantity. Production item delivery shall be within 50 days of FAT approval. Class A packaging is required. The Request for Solicitation will be posted on or about 5 April 2004. Delivery will be F.O.B. Destination, Newport, RI. The Government intends to award a single contract on a Firm Fixed Price basis using the procedures per FAR Part 12 and 13 for commercial items.
 
Record
SN00553405-W 20040326/040324224718 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.