Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 14, 2004 FBO #0778
SOLICITATION NOTICE

C -- Photogrammetry & Aerial Mapping

Notice Date
1/12/2004
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of Energy, Bechtel SAIC Company, LLC (DOE Contractor), Yucca Mountain Project, 1180 Town Center Drive, Las Vegas, NV, 89114
 
ZIP Code
89114
 
Solicitation Number
PPD-SRA-00188
 
Response Due
1/26/2004
 
Archive Date
2/10/2004
 
Point of Contact
John Barr, Subcontract Specialist, Phone 702-821-7309, Fax 702-821-9002,
 
E-Mail Address
john_barr@ymp.gov
 
Description
PROJECT SPECIFIC PRE-QUALIFICATION Pre-qualification No. PPD - SRA-00188 Photogrammetry & Aerial Mapping Nevada Rail - Caliente Corridor Yucca Mountain Project Due Date: January 26, 2004, 4:00 p.m. PST INTRODUCTION Bechtel SAIC Company, LLC (BSC) intends to issue a Request for Proposal (RFP) and to subsequently award one or more Photogrammetry & Aerial Mapping Subcontract(s) for the Nevada Rail Caliente Corridor. The RFP will be made available only to pre-qualified firms or teams. To potentially achieve pre-qualification and receive an RFP, respondents must submit 1) a completed Federal Acquisition Regulation (FAR) Standard Form 254 (Architect-Engineer and Related Services Questionnaire) or equivalent, and 2) a completed Federal Acquisition Regulation (FAR) Standard Form 255 (Architect-Engineer and Related Services Questionnaire for Specific Project) or equivalent. Item 1) should be submitted with information for the lead firm (or for each lead firm if a joint venture) and for each consulting firm or independent associate on the team. Item 2) should be a single submittal on behalf of the entire team. Item 2) should provide respondent's approach to the project including, on a team basis, project personnel by discipline; outside consultants or associates; brief resumes of key personnel including the senior technical manager and key technical personnel; work experience (last 5 years) by team firm members which best illustrates qualifications relevant to the project; work being currently performed by the lead firm or joint venture members directly for Federal Agencies; and additional information (technical approach, summary work plan, description of computational and other resources, etc.) that support team's qualification for the project. Failure to complete a either form may be reason for non-qualification of a team. This procurement has been designated as a Small Business Set-aside by BSC under NAIC's Code(s) 541360 or 541370 and response is limited to those firms who have registered with, and have a profile in, the U.S. Small Business Administration PRO- Net database. SCOPE DESCRIPTION As part of the Yucca Mountain Repository development efforts, the U.S. Department of Energy (DOE) has announced the Caliente rail corridor as its preferred corridor in which to construct a rail line in Nevada, and Carlin as a secondary preference. If the Department adopts the mostly rail mode in Nevada, DOE will issue a Record of Decision selecting a rail corridor no sooner than 30 days after publication of the preference announcement in the Federal Register dated December 29, 2003. The primary Caliente Corridor originates at a junction with the Union Pacific mainline near Caliente, Nevada and extends 319 miles to the Yucca Mountain site, which is 90 miles to the northwest of Las Vegas, Nevada (see Figure 1). The corridor is nominally 1/4 mile (400-meters) wide and consists of a "primary" corridor along with "secondary" options and tertiary options (alternatives)which together total approximately 546 miles in length. After completing an Environmental Impact Statement (EIS) on alternate rail alignments within the corridor, DOE will identify, in a Record of Decision, a rail alignment within the corridor. Work Elements The Work in general shall include but not be limited to the following: - Ground control survey - Acquisition of high resolution ground surface elevation data - Color aerial photography - Logging airborne Global Positioning System (GPS) and inertial measurement unit (IMU) data simultaneously with photography acquisition - Analytical aerotriangulation - Digital planimetric mapping - Digital terrain model (DTM) mapping - Edited 5foot contours from DTM mapping - Edited 2foot contours from DTM mapping - Digital orthophotos with a nominal pixel resolution of 0.5foot. Edited 5 foot contours from DTM mapping for all 546 miles are required approximately four months after Notice to Proceed. Edited 2 foot contours from DTM mapping for approximately 350 miles are required approximately 10 months after Notice to Proceed. Subcontractor's Work Performance and Organization The SUBCONTRACTOR shall perform all work at his (and his lower tier subcontractor's) own offices and at field locations. The SUBCONTRACTOR shall establish a project organization for performance of the work and shall actively manage, integrate and control all of the tasks required. The organization shall be led by a permanent senior technical manager who shall be the principal point of contact between CONTRACTOR and SUBCONTRACTOR and shall be responsible for all aspects of the SUBCONTRACTOR'S work. The senior technical manager shall coordinate, direct and manage all work performed by the SUBCONTRACTOR at SUBCONTRACTOR'S project office, third tier subcontract work wherever performed, and field location work of whatever type and wherever performed. It is anticipated that in the day-to-day conduct of the work, SUBCONTRACTOR'S personnel will be interacting and communicating with counterparts, project engineers, or managers within CONTRACTOR'S staff. Work Products (Deliverables) Ground Control Survey Documentation Aerial Photography Films and Aerotriangulation reports Digital Elevation Models and Digital Terrain Models from 1:20,000 Diapositives Digital Elevation Models and Digital Terrain Models from 1:8,800 Diapositives 1:20,000 Aerial Photos and Photomosaics 1: 8,800 Aerial Photos and Photmosaics 5-foot. contour maps 2-foot. contour maps Safety and Health Program Plan Quality Assurance/Quality Control Plan Figure 1 Caliente Rail Corridor ?V Nevada This figure can be found in the complete solicitation located at http://www.bscupdate.com/supplier_subcontractor/prequal.html LOCATION The work will largely be performed in SUBCONTRACTOR'S offices and at field locations in Nevada. PERIOD OF PERFORMANCE The estimated RFP issuance date is February, 2004. The anticipated date for award of the Subcontract is mid-April 2004, with a Notice to Proceed at that time. See Scope Description for duration of the project phases. SUBCONTRACT TYPE It is anticipated that a fixed unit rate subcontract will be used. The estimated overall value of the Subcontract is in the range $1.5 to 2.5 million. CONFLICT OF INTEREST The questions shown in Table 1 must be responded to as part of the pre-qualification submittal. The same individual signing the Standard Form 255 Form must sign the questionnaire. PRE-QUALIFICATION PROCESS To qualify to receive a RFP, the respondent must provide a response to the questions contained in Table 1. If the respondent answers any question affirmatively but attaches factual and verifiable information that respondent believes demonstrates avoidance of a conflict of interest or potential conflict of interest, BSC will evaluate such attached information, may verify same, and will determine for itself whether a conflict of interest or potential conflict of interest exists or may exist. The completed Standard Form 254 and Standard Form 255 submitted by all respondents will be evaluated. Pre-qualification will be made by a panel of technical and procurement specialists within BSC and will be based solely on the completeness, relevance, quality, and applicability of the data submitted. Those deemed most qualified will be considered pre-qualified. EXCLUDED PARTIES LISTING SYSTEM Affirm that your firm is not listed on the U.S. Government's Lists of Parties Excluded from Federal Procurement and Non-Procurement Programs (Lists). Affirm that you are not aware of any current action by the government, which would preclude your firm from participating (See Table 2). The completed Table 2 must be signed by the same individual signing the Standard Form 255. RESPONSE SUBMITTAL Four (4) hard copies along with electronic submission via email are required no later than 4:00 p.m. (PST) on Monday, January 26, 2004. Include the name, title, address, telephone number, facsimile telephone number, and E-mail address of the responsible person to whom future communications of the RFP pre-qualification and the RFP should be addressed. Address pre-qualifying documentation and all questions concerning this Pre-qualification process to: Bechtel SAIC Company, LLC 1180 Town Center Drive Las Vegas, Nevada 89144 Attention: John Barr Pre-qualification No: PPD-SRA-00183 E-mail: John_Barr@ymp.gov Telephone: (702) 821-7309 Fax: (702) 821-9002 TABLE 1 CONFLICT OF INTEREST QUESTIONNAIRE 1) Will the respondent, during the potential term of theSubcontract, be under contract with or enter into a contract with, any other entity, public or private, directly involved with the Yucca Mountain Rail Project in Nevada? __ Yes __ No If this question is answered by marking the "yes" box, then a full disclosure and discussion must be provided to allow BSC to evaluate the conflict of interest potential. 2) Will the respondent be under contract with, or enter into a contract with, the U.S. Department of Energy, or U.S. Department of Energy's contractor or subcontractor at any tier, for any work directly involved with the performance of environmental analysis and the Environmental Impact Statement for the identification and selection of a specific rail alignment in Nevada? __ Yes __ No If this question is answered by marking the "yes" box, then a full disclosure and discussion must be provided to allow BSC to evaluate the conflict of interest potential. 3) Will the respondent be under contract with, or enter into a contract with, any railroad related facilities, systems, or equipment contractors or suppliers under contract with the U. S. Department of Energy, or U. S. Department of Energy's contractor or subcontractor at any tier, for any work item on the Nevada Transportation portion of the Yucca Mountain Repository development efforts, for which the respondent previously provided services as a part of the proposed Subcontract? __ Yes __ No If this question is answered by marking the "yes" box, then a full disclosure and discussion must be provided to allow BSC to evaluate the conflict of interest potential. The above is fact and intent: ____________________________ ___________________________ Signature Typed Name and Title TABLE 2 AFFIRMATION _______(Campany name)________________________________________is not listed on the U.S. Government's Lists of Parties Excluded from Federal Procurement and Non-Procurement Programs (Lists). I am not aware of any current action by the government, which would preclude _______________________________________________from participating in this procurement. ____________________________ ________________________ Signature Typed Name and Title
 
Place of Performance
Address: Subcontractor's offices and at field locations in Nevada.
Country: USA
 
Record
SN00502137-W 20040114/040112211737 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers