MODIFICATION
66 -- Top-Loading Helium-3 Cryostat
- Notice Date
- 8/27/2003
- Notice Type
- Modification
- Contracting Office
- Department of Commerce, National Institute of Standards and Technology (NIST), Acquisition and Logistics Division, 100 Bureau Drive, Building 301, Room B129, Mail Stop 3571, Gaithersburg, MD, 20899-3571
- ZIP Code
- 20899-3571
- Solicitation Number
- Reference-Number-03-856-3263
- Response Due
- 9/4/2003
- Archive Date
- 9/5/2003
- Point of Contact
- Lisa Sawyer, Contract Specialist, Phone 301-975-3840, Fax 301-975-2541, - Joan Smith, Contract Specialist, Phone (301)975-6458, Fax (301)975-8884,
- E-Mail Address
-
lisa.sawyer@nist.gov, Joan.Smith@nist.gov
- Description
- This announcement amends solicitation number 03-856-3263 issued on June 09,2003 in its entirety. THIS IS A COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH THE FORMAT IN FAR SUBPART 12.6-STREAMLINED PROCEDURES FOR EVALUATION AND SOLICITATION FOR COMMERCIAL ITEMS-AS SUPPLEMENTED WITH ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE. THIS ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION; QUOTATIONS ARE BEING REQUESTED, AND A WRITTEN SOLICITATION DOCUMENT WILL NOT BE ISSUED. This solicitation is a Request for Quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 01-15. ***The associated North American Industrial Classification System (NAICS) code for this procurement is 339111 with a small business size standard of 500 employees. All interested offerors may submit a quote. *** The National Institute of Standards and Technology (NIST) Center for Neutron Research is a leading neutron scattering research facility that serves a community of scientists from around the world. Approximately one thousand guest researchers visit every year to perform experiments, putting a great demand on the performance of the general pool of sample environment equipment used to generate the proper temperature, pressure, magnetic field, etc. This sample environment equipment must perform with high reliability and accuracy, be simple to operate and maneuver, and be adequately protected from abuse by the inclusion of safeguards on its operation. The National Institute of Standards and Technology (NIST), has a requirement for one (1) Top-loading helium-3 cryostat with the following contract options: option to purchase up to two essentially identical systems over the next two years, (2) contractor shall provide the option for NIST to purchase spare or replacement parts, as necessary, over the next two (2) years, (3) provide the option to purchase an extended warranty. All interested parties are invited to submit a quote for the following line items: LINE ITEM 0001: Quantity one (1) each - Top-loading helium-3 cryostat in accordance with the following requirements and specifications; the entire system shall include the cryostat with top-loading sample capability, temperature controller, liquid helium cryogen level sensor and indicator (if applicable), connecting hoses and cables. The system shall not include a vacuum pump for open-loop cooling with helium-4, as NIST shall provide this pump. NIST shall approve drawings before manufacture and shall be given a copy of line drawings (not all manufacturing drawings) for the system. Two (2) copies of the operating manual shall be included with every system. The offered system shall be based on either a liquid helium cryostat or a closed-cycle cryogen-free system. Performance specifications: 1) controlled sample temperature range: 0.5 - 300 K, 2) shall maintain base temperature for a minimum period of 24 hours, 3) liquid helium and liquid nitrogen reservoirs, if used, shall last at least 30 hours when operating at base temperature, 4) minimum sample space diameter: 45 mm, 5) complete temperature control system shall include sensors, heaters, temperature controller, and connecting cables, 6) temperature control shall be stable to within 0.1 degrees Kelvin below 10 K, within 1 % above 10 K, 7) sample shall be in vacuum or a static volume of exchange gas. The exclusive choice of vacuum or exchange gas is not required throughout the entire operating range. For example, exchange gas may be used at high temperatures and vacuum at low temperatures as a normal operating procedure, 8) temperature sensor accuracy at the sample position: +/- 250 mK for T < 25 K, +/- 1% for T > 25 K. Multiple sensors may be employed, 9) no sensors shall be repositioned throughout the operating temperature range, 10) time required for sample mount to reach base temperature after insertion into a cold cryostat shall be a maximum of 5 hours. This is a measure of the time required for sample changes. Facility interface specifications: 1) cryostat shall mount onto a goniometer. The square-mounting surface shall be 250 mm on an edge. There are 4x M6 tapped holes in the goniometer mounting surface, arranged on a 230 mm bolt square (325.3 mm bolt circle diameter), 2) the temperature controller shall provide RS-232 serial connection communication capability, 3) cables and hoses to support equipment such as temperature controllers shall extend at least 15 feet from the cryostat, 4) the cryostat shall provide for the capability to be lifted by an overhead crane or hoist, 5) electrical power requirement: must run on 30A, 220V single phase (NEMA L7-30); 20A, 208V three-phase (NEMA L21-20); or 20A, 120V single phase power (NEMA L5-20), 6) electrical power connections shall extend at least 3 meters from equipment to power outlets, 7) cooling water requirement shall not exceed a maximum flow rate of 7 gpm at 40 psi with connection to a chilled water source. Neutron scattering requirements: The term sample stick refers to the part of the system used in top-loading the sample mount. The sample stick may include the cryogenic insert according to the design of the offered system. 1) Sample space shall accommodate a maximum sample diameter of 45 mm, 2) cryostat shall provide 360 degree access to the sample in the horizontal scattering plane without intersecting any liquid cryogens or any part of the cooling system, 3) sample mounting position shall be 1.75 inches above neutron beam center, 4) sample stick shall be able to be locked against rotation, 5) sample stick is not required to be height adjustable, but +/- 1.5 inches adjustment capability from nominal position is preferred, 6) horizontal neutron scattering plane centerline shall be 6 inches above the base flange, with an overall beam height of 3 inches, 7) thinned aluminum or aluminum alloy windows shall be used in the neutron scattering plane with a maximum total thickness of 0.100 inches of material between the sample position and the exterior of the cryostat, 8) connection to sample shall be via a 5/16-18 threaded stud on the vendor's equipment with a maximum length of 0.375 inches. In addition, there are less stringent demands on the size of the entire cryostat. As a guide, the entire cryostat should not exceed a diameter of 10 inches in the neutron beam path. Above the neutron beam path, the cryostat should be less than 24 inches in diameter. The overall height should not exceed 6 feet in a running configuration, and NIST has ample overhead clearance for removing cryogenic inserts, etc. The figures just listed are guidelines only, and are not inviolable requirements. OPTION 0002: Quantity Not to Exceed (NTE) two (2) each - Identical cryostats as identified in Line item 0001 within a two (2) year period. Any modifications requested by NIST shall be allowed that do not alter the essential characteristics of the system and shall be approved by NIST. Option 0003 - Option to purchase an extended warranty. Option 0004 - Quantity Not To Exceed (NTE) three 3) each - Helium level sensor Option 0005 - Quantity NTE three (3) each - Helium level indicator Option 0006 - Quantity NTE five (5) each - System Electrical cables Option 0007 - Quantity NTE five (5) each - valves Option 0008 - Quantity NTE twenty (20) each - fittings Option 0009 - Quantity NTE three (3) each - Cryogenic needle valve assembly Option 0010 - Quantity NTE two (2) each - Temperature controller Option 0011 - Quantity NTE five (5) each - Temperature sensors Option 0012 - Quantity NTE three (3) pairs - High-pressure gas lines (sold as pairs) Option 0013 - Quantity NTE three (3) each - Compressor components Option 0014 - Quantity NTE three (3) each - Cryostat tailset Option 0015 - Quantity NTE six (6) each - Sample-in-Vacuum can (if applicable) Option 0016 - Quantity NTE three (3) each - Sample stick DELIVERY SHALL BE FOB DESTINATION. Delivery is required within 10 months after drawing approval by the Government. *** The Contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. Award shall be made to the offeror whose quote offers the best value to the Government, technical, price, and other factors considered. The Government will evaluate information based on the following evaluation criteria: 1)Technical Capability factors that adhere to the technical specifications, user-friendly temperature control, cryogen maintenance specification requirements, and robust design. User-friendly temperature control, cryogen maintenance requirements, and robust design are inherently germane to the use of the system by NIST personnel. User-friendly temperature control that is easy to operate, either through simple and objective procedures or a uniform interface, shall be judged more highly. Additionally, Cryogen maintenance requirements refer to both the periodic need to refill liquid cryogens (nitrogen and helium) and the periodic need to recycle closed-loop cryogenic helium-3. Systems that operate for longer periods between cryogen maintenance shall be judged more highly. Robust design elements are those that enable enhanced reliability, lower risk in operation, or simple, inexpensive repair capability. Systems that incorporate these elements shall be judged more highly. 2) Past performance and 3) Price. Technical and Past Performance, when combined, are more important than price. The selection factors for this RFQ are adherence to the technical specifications, user-friendly temperature control, cryogen maintenance requirements, past performance and price.*** Evaluation of Technical Capability shall be based on the information provided in the quotation. Offerors shall include the make and model of the product, manufacturer sales literature or other product literature which clearly documents that the offered product meets or exceeds the specifications stated above. Evaluation of Past Performance shall be based on the references provided IAW FAR 52.212-1(b)(10) and/or information provided by NIST and its affiliates. Offerors shall provide a list of at least THREE (3) REFERENCES to whom the same or similar products have been sold. The list of references shall include, at a minimum: The name of the reference contact person and the company or organization; the telephone number of the reference contact person; the contract or grant number; the amount of the contract and the address and the telephone number of the Contracting Officer if applicable; and the date of delivery or the date services were completed. Past Performance shall be evaluated to determine the overall quality of the product and service provided by the Contractor. Offerors with no relevant past performance shall not be evaluated favorably or unfavorably. *** The following provisions and clauses apply to this acquisition: PROVISIONS: 52.204-6 Data Universal Numbering System (DUNS) Number; 52.212-1 Instructions to Offerors-Commercial Items. CLAUSES: 52.212-4 Contract Terms and Conditions-Commercial Items; 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items including subparagraphs: (1) 52.217-5, Evaluation of Options (7/90); (2) 52.217-7, Option for Increased Quantity - Separately Priced Line Item (3/89);(3) 52.222-3, Convict Labor (E.O. 11755); (4) 52.233-3, Protest after Award (31 U.S.C 3553);(5) 52.203-6, Restrictions on Subcontractor Sales to the Government, with Alternate I (41 U.S.C. 253g and 10 U.S.C. 2402);(6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 1999); (7) 52.219-8, Utilization of Small Business Concerns (15 U.S.C. 637(d)(2)and (3); (8) 52.219-14, Limitations on Subcontracting (15 U.S.C. 637 (a)(14)); (9) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Pub. L. 103-355, section 7102, and 10 U.S.C.2323) (10) 52.222-21, Prohibition of Segregated Facilities; (11) 52.222-26, Equal Opportunity; (12) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era and Other Eligible Veterans (38 U.S.C 4212);(13) 52.222-36, Affirmative Action for Workers with Disabilities;(14) 52.222-37 Employment Reports on Special Disabled Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C 4212)(15) 52.222-19 Child Labor - Cooperation With Authorities And Remedies; (16) 52.225-5, Trade Agreements (19 U.S.C. 2501, et seq., 19 U>S.C. 3301 note); (17) 52.225-13 Restriction on Certain Foreign Purchases (E.O. 12722, 12724, 13059, 13067, 13121, and 13129; and (18) 52.232 34, Payment by Electronic Funds Transfer - Other than Central Contractor Registration (31 USC 3332); and (19) Department of Commerce Agency-Level Protest Procedures Level above the Contracting Officer is also incorporated. It can be downloaded at www.nist.gov/admin/od/contract/agency.htm. *** All interested parties should submit quotes to include the following: 1) Two copies of a quotation which addresses the line items; 2) Two copies of the technical description and/or product literature; 3) Description of commercial warranty; 4) Two (2) copies of the most recent published price list(s); and 5) A completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items which may be downloaded at www.arnet.gov/far. *** All quotes should be sent to the National Institute of Standards and Technology, Acquisition and Logistics Division, Attn: Lisa Sawyer, Building 301, Room B129, 100 Bureau Drive, Stop 3571, Gaithersburg, MD 20899-3571. *** Submission must be received by 3:00 p.m. local time on September 04, 2003. FAX & E-MAIL QUOTES SHALL NOT BE ACCEPTED.
- Place of Performance
- Address: 100 Bureau Drive, Gaithersburg, MD
- Zip Code: 20899
- Zip Code: 20899
- Record
- SN00413389-W 20030829/030827213301 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |