SOURCES SOUGHT
59 -- Near-Infrared (NIR) Moisture Content Analyzer Requirements
- Notice Date
- 6/19/2003
- Notice Type
- Sources Sought
- Contracting Office
- US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
- ZIP Code
- 07806-5000
- Solicitation Number
- DAAE30-03-Q-0247
- Response Due
- 7/7/2003
- Point of Contact
- Cathy Kallistros, Contract Specialist, 973-724-3071
- E-Mail Address
-
Email your questions to Cathy Kallistros
(ckallis@pica.army.mil)
- Description
- The U.S. Army Tank-Automotive and Armaments Command, Armament Research, Development and Engineering Center/(TACOM-ARDEC), Picatinny Arsenal requires the Near-Infrared (NIR) Moisture Content Analyzer with the following requirements: General - New, Near-Infrard, Reflectance, Direct Analysis, Moisture Content Analyzer; Wavelength Range 400 - 2500 nan-meters; Completely sealed Monochromator unit; Data Acqusition Rate: min 2 scans per second; Calibration (samples) must be transferable between similar units; All power cords, serial, ethernet cables, NIR certification standards etc. required to set up and run the NIR Analyzer. Operating Conditions - Temperature range 65 to 80 degrees F; 10 to 90% relative humidity. Size - Maximum foot print / size: 24"W x 18"H x 24"D; Weight less than 75lbs. Electrical Power Requirements - 115 VAC single phase, 60 Hz, ~2.6 amps or less (300 watt or less) Computer / Interface requirements - 1) Pentium 4, 2.0 GHz min., 1 Mega Byte DDR RAM min computer running Window 2000 or Windows XP with 40 GB min Hard Disk; 2) Any propretary software required to interface between the computer and the NIR Moisture Analyzer; 3) High speed 100 MBS Ethernet / Serial / USB or Parallel connection between computer and NIR Analyzer. Training/Technical Support - The contractor shall provide for a basic training course on the NIR Analyzer for at least four government employees. The contractor shall provide for at least three days of on-site, hands on technical support. Spare Parts - The contractor shall supply the following spare parts: 1) At least 2 lamps 2) Any filters (Air, Water etc.) 3) Fuses (Or other standard parts necessary to support a minimum work load of 500 hrs. Safety - Ability to locate the controlling computer behind a blast wall. Distance between Near IR Analyzer and control computer not to exceed 300 feet. Interested parties should submit their quotation to Ms. Cathy Kallistros, AMSTA-AQ-APB, (973)724-3071 (e-mail ckallis@pica.army.mil). Response to this notice may be submitted using electronic methods such as e-mail.
- Web Link
-
US ARMY TACOM-ARDEC Procurement Network
(http://procnet.pica.army.mil/cbd/SRCSgt/061920031/061920031.htm)
- Record
- SN00351998-W 20030621/030620004533 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |