Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 08, 2003 FBO #0525
SOLICITATION NOTICE

Y -- Construction of Centeral Utility Plant

Notice Date
5/6/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Mountain Administrative Support Center, 325 Broadway - MC3, Boulder, CO, 80305-3328
 
ZIP Code
80305-3328
 
Solicitation Number
RA1341-03-RB-3018
 
Response Due
7/31/2003
 
Archive Date
9/30/2003
 
Point of Contact
Jan Clark, Contract Specialist, Phone (303) 497-6320, Fax (303) 497-3163, - Rhonda Nelson, Procurement Technician, Phone (303) 497-3487, Fax (303) 497-3163,
 
E-Mail Address
jan.clark@noaa.gov, Rhonda.Nelson@noaa.gov
 
Small Business Set-Aside
8a Competitive
 
Description
The National Institute of Standards and Technology (NIST) located in Boulder, Colorado has a requirement for the construction of a new Central Utility Plant (CUP), Phase 1 at the Boulder Laboratory site at 325 Broadway, Boulder, CO. The purpose of this requirement is to provide Phase 1 of a new 24,000 SF state-of-the-art CUP facility that is code compliant, sustainable, energy efficient, safe, accessible, user friendly, and easily maintainable. This phase of the project shall be planned to be adaptable to a future Phase 2 of the CUP as well as a new Site Utility Distribution System (SUDS) also to be included in Phase 2. Phase 2 is not a part of this requirement. Phase 1 of the CUP includes the construction of the following: (1) the entire CUP building; (2) paved parking lots and drives including provisions for Boulder Fire Department access; (3) storm water drainage and detention facility; (4) landscape and irrigation system; (5) required utility connections; (6) steam and compressed air services to Buildings 2 and 3; and (7) removal and disposal of two old boilers located in Building 3. The plans and specifications to be issued with this solicitation are preliminary in nature and are to be used for project familiarization only and not used for construction. A complete design update is expected to be issued by July 7, 2003. This design update will be used as a basis for the construction of the CUP and will be forwarded to all bidders that had requested a copy of the solicitation document. It is anticipated that the solicitation will be issued by June 16, 2003 and bids would be due July 31, 2003. The delivery schedule for completion of construction is 12 months after the Notice to Proceed. The estimated price range for this requirement is between $5,000,000 and $10,000,000. THIS ACQUISITION IS RESTRICTED TO COLORADO ELIGIBLE 8(A) FIRMS ONLY. The NAICS code for this requirement is 236220 ($28.5 Million).
 
Place of Performance
Address: Department of Commerce, National Institute of Standards and Technology, Boulder Laboratories, 325 Broadway, Boulder, CO 80305-3328
Zip Code: 80305-3328
Country: United States
 
Record
SN00318664-W 20030508/030506213206 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.