SOURCES SOUGHT
U -- TYMCO Runway Sweeper Training
- Notice Date
- 10/15/2002
- Notice Type
- Sources Sought
- Contracting Office
- Department of the Air Force, Air Education and Training Command, Specialized Contracting Squadron, 2021 First Street West, Randolph AFB, TX, 78150-4302
- ZIP Code
- 78150-4302
- Solicitation Number
- Reference-Number-F41689-03-X-0701
- Archive Date
- 11/29/2002
- Point of Contact
- Jodie Carlson, Contract Specialist, Phone 210-652-6523, Fax 210-652-3629, - Jodie Carlson, Contract Specialist, Phone 210-652-6523, Fax 210-652-3629,
- E-Mail Address
-
jodie.carlson@randolph.af.mil, jodie.carlson@randolph.af.mil
- Description
- You are invited to submit a budgetary quotation, under Request For Quotation number F41689-03-X-0701, to furnish training as outlined in the Performance Work Statement below. This request is for informational planning purposes only and is important for establishment of a realistic cost estimate. The government does not intend to award a contract on the basis of this solicitation, or otherwise pay for the information solicited except as provided in subsection 31.205-18, bid and proposal (b&p) costs, of the federal acquisition regulation. Identify any factors that would affect the prices quoted, and specify equipment and technical data that would be needed to support training (inclusive of stock number, part number, noun description, T.O. numbers, description of manuals and software). Also, specify whether said items would be Contractor or Government furnished. For performance in overseas areas, please identify logistical and administrative support required for your instructors. Your quotation should arrive at the above address not later than COB, 14 Nov 02 and have a validity period of at least 180 days. This is the minimum time required for processing by HQ USAF and review by the customer country. PERFORMANCE WORK STATEMENT. 1. Scope -- a. Training is required by the USAF in support of an Egyptian Air Force (EAF) Foreign Military Sales program. Proposed training will be Type 1 contractor training, procured by Air Education and Training Command (AETC) and presented under the auspices of Air Force Security Assistance Training Program. All instruction is to be in the English language and in the CONUS. -- b. Training shall be to the levels indicated below for a total of eight EAF technicians on the Tymco Runway Sweeper, no model has been defined however, it is expected to be either Model 600 or 600HSP. Training should include the sweeper system, engine, transmission, chassis, brakes, and other major systems. -- 1) Operator and Maintenance Training for four Technicians. Training should include operation of all systems to include the chassis. Maintenance training should include normal servicing of all systems and O-level functions. All four technicians are to receive the same training. -- 2) Depot or Overhaul Level Training for four EAF Technicians. Training should include maintenance and overhaul of all major systems listed above. -- 2. Technical Training. -- a. The contractor shall propose course content and duration of training. The training objective is to provide the EAF trainees with the overhaul knowledge and skills necessary to succeed as operators and maintainers of the above listed equipment. -- b. The contractor shall provide course documents reflecting course content and duration, and provide course outlines detailing major topics/assemblies and the hours required to train the EAF technicians. Training shall include combinations of formal classroom instruction and "hands-on" practical exercises so as to provide skill proficiency to perform tasks "unsupervised." Primary emphasis shall be "hands-on" practical experience. Training is desired between Oct 03 and Jun 04; the contractor shall specify the exact dates. -- 3. Training Materials. -- Training materials can be in contractor format. All training materials used by the student during course presentation will be retained by the student. -- 4. Local Transportation and Quarters. -- The contractor shall propose transportation from and to the local airport, and from quarters to and from the training site. The contractor shall propose quarters for the duration of training to include two days prior to training start and one day after training completion.
- Record
- SN00188205-W 20021017/021015213233 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |