Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 26, 2002 FBO #0236
MODIFICATION

Z -- Erosion Control Package - Fort Bragg, North Carolina

Notice Date
7/24/2002
 
Notice Type
Modification
 
Contracting Office
US Army Corps of Engineers, Savannah - Military Works, P.O. Box 889, Savannah, GA 31402-0889
 
ZIP Code
31402-0889
 
Solicitation Number
DACA21-02-B-0019
 
Response Due
9/19/2002
 
Point of Contact
Elaine Radcliffe, (912) 652-5416
 
E-Mail Address
Email your questions to US Army Corps of Engineers, Savannah - Military Works
(elaine.p.radcliffe@sas02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA The Government Point of Entry is amended as follows: To include three bid schedules. Bid Schedule 1 ? This project will consist of grading a portion of Blues Road to improve the drainage from the trail and from the surrounding areas. Rip rap lined channels and grass-lined channels will be constructed along the side of the re-graded trail. An aggregate base course material will be placed for the trail surface. The work extends approximately 5,280 linear feet. All disturbed areas will be seeded and an area for pine seedlings will be established. Additiona l erosion control devices will be constructed. Bid Schedule 2 ? This project will consist of grading a portion of McPherson Tank Trail to improve the drainage from the trail and from the surrounding areas. Rip rap lined channels and grass-lined channels will be constructed along the side of the re-graded trail. An aggregate base course material will be placed for the trail surface. The work extends approximately 5,280 linear feet. All disturbed areas will be seeded and an area for pine seedlings will b e established. Additional erosion control devices will be constructed. Bid Schedule 3 ? This project will consist of grading a portion of Moore County Road to improve the drainage from the road and from the surrounding areas. Rip rap channels and grass- lined channels will be constructed along the side of the re-graded road. An aggregate base course material will be placed for the road surface. The work extends approximately 3,000 linear feet. All disturbed areas will be seeded. Additional erosion con trol devices will be constructed. Any prospective bidder/offeror may submit a bid on one or more or all of the three schedules.
 
Record
SN00124534-W 20020726/020724213624 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.