Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 31, 2002 FBO #0119
MODIFICATION

Z -- Remedial Action - Ruby Gulch Waste Rock Repository and Cap

Notice Date
3/29/2002
 
Notice Type
Modification
 
Contracting Office
Bureau of Reclamation; P. O. Box 25007; Denver, CO 80225
 
ZIP Code
80225
 
Solicitation Number
02SI810754
 
Response Due
5/9/2002
 
Archive Date
8/20/2002
 
Point of Contact
Maureen M. Ludwig, Contract Specialist, FAX: (303) 445-6345
 
Small Business Set-Aside
N/A
 
Description
The Technical Service Center, Denver Office of the Bureau of Reclamation plans to issue an Invitation for Bids to install a Geomembrane Cover System on the Ruby Gulch Waste Rock Repository at Gilt Edge Mine Superfund Site in Lawrence Country, South Dakota. The Gilt Edge Mine is located in the northern Black Hills of South Dakota southeast of the town of Lead. The entrance road to the mine is gravel surfaced and is approximately 2 miles long from the intersection of Highway 385. The South Dakota Department of Transportation contemplates the award of a contract in April 2002 for widening Highway 385. Approximately 500,000 cubic yards of uncrushed rock and earthen materials will be transported, by the Highway 385 contractor, and stockpiled at the Gilt Edge Mine for use in the contract contemplated by this announcement. The solicitation for this project will contain one (1) bid schedule for - Mobilization; crushing and processing rock, earth material, and riprap; rock excavation requiring drilling and blasting; excavation of spent ore from the heap leach pad and placing as compacted subgrade for the geomembrane system; installing approximately 65 acres of geomembrane cover system; excavate from stockpile and place an 18-inch minus 1-inch drain layer over the geomembrane, excavate from stockpile and place a two-foot subsoil layer over portions of the geomembrane; excavate from topsoil stockpiles and place a six (6) inch layer over portions of the geomembrane; add organic amendments, nitrogen and phosphate fertilizer; seeding; and crimping hay mulch. In addition, geocomposite membrane will be installed in the diversion ditches and covered with riprap. A single contract award contemplated to the overall lower bidder. The magnitude of the Construction project is estimated "Between $5,000,000 and $10,000,000.00". A FIXED PRICE CONTRACT is contemplated. The work is considered "Construction By Special Trade Contractors "HEAVY HIGHWAY". The North American Industry Classification System (NAICS ) Code is "23499 three-year average annual receipts for determining whether or not a business is small. THIS IS AN UNRESTRICTED PROCUREMENT; however, contract award preferences shall be given to 8(a) Certified, SDB Certified, and all other Small Businesses respectively. All qualified responsible sources may submit a bid, which shall be considered by the agency. The firm date for the receipt of bids is May 9, 2002. The performance period is stated in the Invitation for Bids. A Pre-Bid Conference and Site Visit will be held on Tuesday April 9, 2002 at the Gilt Edge Mine Field Office; located at #2 Gilt Edge Road, Deadwood, South Dakota. The Internet site or URL for the Bureau of Reclamation Electronic Commerce pages is http://ideasec.nbc.gov. Potential bidders are responsible for downloading their own copy of the solicitation. Drawings and specifications, on CD-ROM, will be mailed to firms on the solicitation mailing list concurrently with the posting on the Internet. Technical questions should be referred to: mludwig@do.usbr.gov or FAX: (303) 445-6345; telephone requests will not be considered. It is the bidder's responsibility to monitor the Internet site for the release of the solicitation and amendments (if any).
 
Place of Performance
Address: Lead (Lawrence Country), South Dakota.
Zip Code: 57732
Country: US
 
Record
SN00050771-W 20020331/020329213348 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.